Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
19701 | 493 | 26.1 | 54% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | CLUSTER TOOL | authKW | 3095873 | 12% | 88% | 57 |
2 | ROBOTIC CELL | authKW | 2794874 | 12% | 79% | 57 |
3 | CYCLIC SCHEDULING | authKW | 2175718 | 13% | 53% | 66 |
4 | HOIST SCHEDULING | authKW | 1548420 | 5% | 100% | 25 |
5 | ROBOTIC SCHEDULING | authKW | 624528 | 2% | 92% | 11 |
6 | CYCLIC HOIST SCHEDULING | authKW | 495494 | 2% | 100% | 8 |
7 | SINGLE SERVER | authKW | 376625 | 3% | 41% | 15 |
8 | CYCLIC SOLUTIONS | authKW | 318530 | 1% | 86% | 6 |
9 | HOIST SCHEDULING PROBLEM | authKW | 318530 | 1% | 86% | 6 |
10 | CYCLIC JOB SHOP | authKW | 309684 | 1% | 100% | 5 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Operations Research & Management Science | 27138 | 53% | 0% | 261 |
2 | Engineering, Manufacturing | 12321 | 27% | 0% | 135 |
3 | Engineering, Industrial | 11785 | 27% | 0% | 132 |
4 | Automation & Control Systems | 1862 | 13% | 0% | 64 |
5 | Computer Science, Interdisciplinary Applications | 1744 | 16% | 0% | 81 |
6 | Robotics | 1354 | 5% | 0% | 24 |
7 | COMPUTER APPLICATIONS & CYBERNETICS | 371 | 1% | 0% | 4 |
8 | Management | 313 | 6% | 0% | 29 |
9 | Mathematics, Applied | 147 | 8% | 0% | 40 |
10 | Computer Science, Cybernetics | 134 | 2% | 0% | 8 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | ENGN MANAGEMENT PROC | 123874 | 0% | 100% | 2 |
2 | LOSI | 72058 | 2% | 15% | 8 |
3 | ADM SCI ECON ISTINYE | 61937 | 0% | 100% | 1 |
4 | AUTOMAT MECH PROD SYST | 61937 | 0% | 100% | 1 |
5 | AZFSM FAB IND ENGN 12 22 32 | 61937 | 0% | 100% | 1 |
6 | AZFSM IND ENGN | 61937 | 0% | 100% | 1 |
7 | COMP COMPUTAT ENGN | 61937 | 0% | 100% | 1 |
8 | CONTROL MANAGEMENT SYST | 61937 | 0% | 100% | 1 |
9 | EQUIPE PROD | 61937 | 0% | 100% | 1 |
10 | G SCOPINPGRENOBLE | 61937 | 0% | 100% | 1 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING | 49552 | 6% | 3% | 29 |
2 | JOURNAL OF SCHEDULING | 45789 | 4% | 4% | 21 |
3 | IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING | 40541 | 6% | 2% | 32 |
4 | INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS | 22684 | 2% | 4% | 9 |
5 | COMPUTERS & OPERATIONS RESEARCH | 13471 | 6% | 1% | 32 |
6 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | 11797 | 8% | 0% | 40 |
7 | IIE TRANSACTIONS | 10632 | 4% | 1% | 21 |
8 | IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION | 7149 | 3% | 1% | 13 |
9 | IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS | 5659 | 1% | 1% | 7 |
10 | OPERATIONS RESEARCH | 4652 | 3% | 0% | 16 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | CLUSTER TOOL | 3095873 | 12% | 88% | 57 | Search CLUSTER+TOOL | Search CLUSTER+TOOL |
2 | ROBOTIC CELL | 2794874 | 12% | 79% | 57 | Search ROBOTIC+CELL | Search ROBOTIC+CELL |
3 | CYCLIC SCHEDULING | 2175718 | 13% | 53% | 66 | Search CYCLIC+SCHEDULING | Search CYCLIC+SCHEDULING |
4 | HOIST SCHEDULING | 1548420 | 5% | 100% | 25 | Search HOIST+SCHEDULING | Search HOIST+SCHEDULING |
5 | ROBOTIC SCHEDULING | 624528 | 2% | 92% | 11 | Search ROBOTIC+SCHEDULING | Search ROBOTIC+SCHEDULING |
6 | CYCLIC HOIST SCHEDULING | 495494 | 2% | 100% | 8 | Search CYCLIC+HOIST+SCHEDULING | Search CYCLIC+HOIST+SCHEDULING |
7 | SINGLE SERVER | 376625 | 3% | 41% | 15 | Search SINGLE+SERVER | Search SINGLE+SERVER |
8 | CYCLIC SOLUTIONS | 318530 | 1% | 86% | 6 | Search CYCLIC+SOLUTIONS | Search CYCLIC+SOLUTIONS |
9 | HOIST SCHEDULING PROBLEM | 318530 | 1% | 86% | 6 | Search HOIST+SCHEDULING+PROBLEM | Search HOIST+SCHEDULING+PROBLEM |
10 | CYCLIC JOB SHOP | 309684 | 1% | 100% | 5 | Search CYCLIC+JOB+SHOP | Search CYCLIC+JOB+SHOP |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | GEISMAR, N , DAWANDE, M , SRISKANDARAJAH, C , (2011) PRODUCTIVITY IMPROVEMENT FROM USING MACHINE BUFFERS IN DUAL-GRIPPER CLUSTER TOOLS.IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING. VOL. 8. ISSUE 1. P. 29 -41 | 44 | 98% | 12 |
2 | KIM, C , LEE, TE , (2016) FEEDBACK CONTROL OF CLUSTER TOOLS FOR REGULATING WAFER DELAYS.IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING. VOL. 13. ISSUE 2. P. 1189 -1199 | 39 | 93% | 1 |
3 | CHE, A , CHU, CB , FENG, JG , (2015) DYNAMIC HOIST SCHEDULING PROBLEM WITH MULTI-CAPACITY REENTRANT MACHINES: A MIXED INTEGER PROGRAMMING APPROACH.COMPUTERS & INDUSTRIAL ENGINEERING. VOL. 87. ISSUE . P. 611 -620 | 38 | 97% | 3 |
4 | PAN, CR , QIAO, Y , ZHOU, MC , WU, NQ , (2015) SCHEDULING AND ANALYSIS OF START-UP TRANSIENT PROCESSES FOR DUAL-ARM CLUSTER TOOLS WITH WAFER REVISITING.IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING. VOL. 28. ISSUE 2. P. 160 -170 | 44 | 85% | 2 |
5 | LEVNER, E , KATS, V , DE PABLO, DAL , CHENG, TCE , (2010) COMPLEXITY OF CYCLIC SCHEDULING PROBLEMS: A STATE-OF-THE-ART SURVEY.COMPUTERS & INDUSTRIAL ENGINEERING. VOL. 59. ISSUE 2. P. 352-361 | 55 | 66% | 59 |
6 | LEE, JH , KIM, HJ , (2016) MAKESPAN ANALYSIS OF LOT SWITCHING PERIOD IN CLUSTER TOOLS.IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING. VOL. 29. ISSUE 2. P. 127 -136 | 37 | 100% | 0 |
7 | LI, X , CHAN, FTS , CHUNG, SH , (2015) OPTIMAL MULTI-DEGREE CYCLIC SCHEDULING OF MULTIPLE ROBOTS WITHOUT OVERLAPPING IN ROBOTIC FLOWSHOPS WITH PARALLEL MACHINES.JOURNAL OF MANUFACTURING SYSTEMS. VOL. 36. ISSUE . P. 62 -75 | 35 | 100% | 2 |
8 | KIM, DK , LEE, TE , KIM, HJ , (2016) OPTIMAL SCHEDULING OF TRANSIENT CYCLES FOR SINGLE-ARMED CLUSTER TOOLS WITH PARALLEL CHAMBERS.IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING. VOL. 13. ISSUE 2. P. 1165 -1175 | 37 | 95% | 0 |
9 | KIM, HJ , LEE, JH , BAIK, S , LEE, TE , (2015) SCHEDULING IN-LINE MULTIPLE CLUSTER TOOLS.IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING. VOL. 28. ISSUE 2. P. 171 -179 | 36 | 97% | 1 |
10 | ZHU, QH , WU, NQ , QIAO, Y , ZHOU, MC , (2016) OPTIMAL SCHEDULING OF COMPLEX MULTI-CLUSTER TOOLS BASED ON TIMED RESOURCE-ORIENTED PETRI NETS.IEEE ACCESS. VOL. 4. ISSUE . P. 2096 -2109 | 37 | 90% | 0 |
Classes with closest relation at Level 1 |