Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
32927 | 132 | 14.3 | 32% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | COUPLED TASKS | authKW | 1703427 | 7% | 82% | 9 |
2 | PULSE INTERLEAVING | authKW | 1387980 | 5% | 100% | 6 |
3 | DWELL SCHEDULING | authKW | 963873 | 4% | 83% | 5 |
4 | CUED SEARCH | authKW | 462660 | 2% | 100% | 2 |
5 | HEMISPHERICAL SCAN COVERAGE | authKW | 462660 | 2% | 100% | 2 |
6 | MAXIMUM SCAN ANGLE | authKW | 462660 | 2% | 100% | 2 |
7 | MULTIPLE PULSES IN THE AIR | authKW | 462660 | 2% | 100% | 2 |
8 | MULTIPLE TIME AROUND | authKW | 462660 | 2% | 100% | 2 |
9 | ARBEITSBERIECH HOCHFREQUENZTECH | address | 231330 | 1% | 100% | 1 |
10 | CHAIN REENTRANT | authKW | 231330 | 1% | 100% | 1 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Telecommunications | 3644 | 44% | 0% | 58 |
2 | Engineering, Aerospace | 2032 | 19% | 0% | 25 |
3 | Engineering, Electrical & Electronic | 1449 | 61% | 0% | 80 |
4 | Operations Research & Management Science | 1218 | 22% | 0% | 29 |
5 | Automation & Control Systems | 101 | 6% | 0% | 8 |
6 | Remote Sensing | 94 | 4% | 0% | 5 |
7 | Engineering, Industrial | 81 | 5% | 0% | 6 |
8 | Engineering, Manufacturing | 34 | 3% | 0% | 4 |
9 | Imaging Science & Photographic Technology | 29 | 2% | 0% | 3 |
10 | Computer Science, Interdisciplinary Applications | 18 | 4% | 0% | 5 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | ARBEITSBERIECH HOCHFREQUENZTECH | 231330 | 1% | 100% | 1 |
2 | COMBAT RADAR SYST LTD | 231330 | 1% | 100% | 1 |
3 | FORCE VIS | 231330 | 1% | 100% | 1 |
4 | ICD UMR CNRS 6281 | 231330 | 1% | 100% | 1 |
5 | INFORMAT SYST SUPPLY CHAIN MANAGEMENT DECI | 231330 | 1% | 100% | 1 |
6 | INTELLEGENCE SURVEILLANCE RECONNAISSANCE | 231330 | 1% | 100% | 1 |
7 | MPC 10A | 231330 | 1% | 100% | 1 |
8 | NETWORKING MULITMEDIA | 231330 | 1% | 100% | 1 |
9 | RADIO FREQUENCY EXPLOITAT TECHNOL BRANCH | 231330 | 1% | 100% | 1 |
10 | RADIOSYST | 231330 | 1% | 100% | 1 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | GEC JOURNAL OF RESEARCH | 33614 | 4% | 3% | 5 |
2 | IEEE TRANSACTIONS ON AEROSPACE AND ELECTRONIC SYSTEMS | 21595 | 15% | 0% | 20 |
3 | GEC REVIEW | 20112 | 2% | 4% | 2 |
4 | IET RADAR SONAR AND NAVIGATION | 8073 | 5% | 1% | 6 |
5 | IEE PROCEEDINGS-F RADAR AND SIGNAL PROCESSING | 4306 | 3% | 0% | 4 |
6 | JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS | 3990 | 4% | 0% | 5 |
7 | RAIRO-OPERATIONS RESEARCH | 2220 | 2% | 0% | 2 |
8 | MATHEMATICAL METHODS OF OPERATIONS RESEARCH | 2049 | 2% | 0% | 3 |
9 | JOURNAL OF SCHEDULING | 1549 | 2% | 0% | 2 |
10 | OPERATIONS RESEARCH LETTERS | 1326 | 3% | 0% | 4 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | COUPLED TASKS | 1703427 | 7% | 82% | 9 | Search COUPLED+TASKS | Search COUPLED+TASKS |
2 | PULSE INTERLEAVING | 1387980 | 5% | 100% | 6 | Search PULSE+INTERLEAVING | Search PULSE+INTERLEAVING |
3 | DWELL SCHEDULING | 963873 | 4% | 83% | 5 | Search DWELL+SCHEDULING | Search DWELL+SCHEDULING |
4 | CUED SEARCH | 462660 | 2% | 100% | 2 | Search CUED+SEARCH | Search CUED+SEARCH |
5 | HEMISPHERICAL SCAN COVERAGE | 462660 | 2% | 100% | 2 | Search HEMISPHERICAL+SCAN+COVERAGE | Search HEMISPHERICAL+SCAN+COVERAGE |
6 | MAXIMUM SCAN ANGLE | 462660 | 2% | 100% | 2 | Search MAXIMUM+SCAN+ANGLE | Search MAXIMUM+SCAN+ANGLE |
7 | MULTIPLE PULSES IN THE AIR | 462660 | 2% | 100% | 2 | Search MULTIPLE+PULSES+IN+THE+AIR | Search MULTIPLE+PULSES+IN+THE+AIR |
8 | MULTIPLE TIME AROUND | 462660 | 2% | 100% | 2 | Search MULTIPLE+TIME+AROUND | Search MULTIPLE+TIME+AROUND |
9 | CHAIN REENTRANT | 231330 | 1% | 100% | 1 | Search CHAIN+REENTRANT | Search CHAIN+REENTRANT |
10 | COMMUNICATION SOURCE LOCATING | 231330 | 1% | 100% | 1 | Search COMMUNICATION+SOURCE+LOCATING | Search COMMUNICATION+SOURCE+LOCATING |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | MIR, HS , GUITOUNI, A , (2014) VARIABLE DWELL TIME TASK SCHEDULING FOR MULTIFUNCTION RADAR.IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING. VOL. 11. ISSUE 2. P. 463-472 | 9 | 90% | 2 |
2 | BLAZEWICZ, J , PAWLAK, G , TANAS, M , WOJCIECHOWICZ, W , (2012) NEW ALGORITHMS FOR COUPLED TASKS SCHEDULING - A SURVEY.RAIRO-OPERATIONS RESEARCH. VOL. 46. ISSUE 4. P. 335-353 | 12 | 71% | 1 |
3 | LEHOUX-LEBACQUE, V , BRAUNER, N , FINKE, G , (2015) IDENTICAL COUPLED TASK SCHEDULING: POLYNOMIAL COMPLEXITY OF THE CYCLIC CASE.JOURNAL OF SCHEDULING. VOL. 18. ISSUE 6. P. 631 -644 | 11 | 69% | 0 |
4 | ECKER, K , TANAS, M , (2012) COMPLEXITY OF SCHEDULING OF COUPLED TASKS WITH CHAINS PRECEDENCE CONSTRAINTS AND ANY CONSTANT LENGTH OF GAP.JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY. VOL. 63. ISSUE 4. P. 524-529 | 8 | 100% | 1 |
5 | CONDOTTA, A , SHAKHLEVICH, NV , (2012) SCHEDULING COUPLED-OPERATION JOBS WITH EXACT TIME-LAGS.DISCRETE APPLIED MATHEMATICS. VOL. 160. ISSUE 16-17. P. 2370-2388 | 11 | 65% | 1 |
6 | BEN ABDELAZIZ, F , MIR, H , (2016) AN OPTIMIZATION MODEL AND TABU SEARCH HEURISTIC FOR SCHEDULING OF TASKS ON A RADAR SENSOR.IEEE SENSORS JOURNAL. VOL. 16. ISSUE 17. P. 6694 -6702 | 12 | 52% | 0 |
7 | BLAZEWICZ, J , ECKER, K , KIS, T , POTTS, CN , TANAS, M , WHITEHEAD, J , (2010) SCHEDULING OF COUPLED TASKS WITH UNIT PROCESSING TIMES.JOURNAL OF SCHEDULING. VOL. 13. ISSUE 5. P. 453-461 | 7 | 100% | 7 |
8 | MUNIER-KORDON, A , REBAINE, D , (2014) THE COUPLED UNIT-TIME OPERATIONS PROBLEM ON IDENTICAL PARALLEL MACHINES WITH RESPECT TO THE MAKESPAN.OPERATIONS RESEARCH LETTERS. VOL. 42. ISSUE 1. P. 21-26 | 6 | 86% | 0 |
9 | JIMENEZ, MI , DEL VAL, L , VILLACORTA, JJ , IZQUIERDO, A , (2012) DESIGN OF TASK SCHEDULING PROCESS FOR A MULTIFUNCTION RADAR.IET RADAR SONAR AND NAVIGATION. VOL. 6. ISSUE 5. P. 341 -347 | 5 | 100% | 5 |
10 | WINSOR, C , HUGHES, EJ , (2012) OPTIMISATION AND EVALUATION OF RECEIVER SEARCH STRATEGIES FOR ELECTRONIC SUPPORT.IET RADAR SONAR AND NAVIGATION. VOL. 6. ISSUE 4. P. 233 -240 | 5 | 100% | 2 |
Classes with closest relation at Level 1 |