Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
13373 | 842 | 23.5 | 52% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | WAFER FABRICATION | authKW | 1405557 | 7% | 64% | 61 |
2 | IND ENGN SYST MANAGEMENT | address | 1039594 | 10% | 34% | 85 |
3 | SEMICONDUCTOR MANUFACTURING | authKW | 792302 | 11% | 23% | 95 |
4 | WAFER FAB | authKW | 479959 | 2% | 88% | 15 |
5 | FUZZY BACK PROPAGATION NETWORK | authKW | 372996 | 1% | 86% | 12 |
6 | CAPACITY PLANNING | authKW | 343451 | 7% | 16% | 60 |
7 | FLUCTUATION SMOOTHING | authKW | 293735 | 1% | 90% | 9 |
8 | CYCLE TIME | authKW | 254878 | 5% | 16% | 43 |
9 | MACHINE DEDICATION | authKW | 253847 | 1% | 100% | 7 |
10 | IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING | journal | 231976 | 12% | 6% | 100 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Engineering, Manufacturing | 68830 | 49% | 0% | 415 |
2 | Engineering, Industrial | 33703 | 35% | 0% | 291 |
3 | Operations Research & Management Science | 29420 | 42% | 0% | 356 |
4 | Computer Science, Interdisciplinary Applications | 1911 | 13% | 0% | 112 |
5 | Automation & Control Systems | 1662 | 10% | 0% | 80 |
6 | Computer Science, Artificial Intelligence | 1081 | 10% | 0% | 83 |
7 | Robotics | 709 | 3% | 0% | 23 |
8 | Management | 671 | 7% | 0% | 55 |
9 | Engineering, Electrical & Electronic | 650 | 18% | 0% | 154 |
10 | Physics, Condensed Matter | 340 | 12% | 0% | 105 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | IND ENGN SYST MANAGEMENT | 1039594 | 10% | 34% | 85 |
2 | DMOS6 | 145055 | 0% | 100% | 4 |
3 | WW TMG IT | 145055 | 0% | 100% | 4 |
4 | IND ENGN ENGN MANAGEMENT | 129432 | 7% | 6% | 63 |
5 | PROGRAM IND ENGN OPERAT | 72528 | 0% | 100% | 2 |
6 | PLANNING OPERAT MANAGEMENT GRP | 65272 | 0% | 60% | 3 |
7 | IND ENGN MANAGEMENT | 47916 | 11% | 1% | 89 |
8 | ADV PLANNING EDULING GRP | 36264 | 0% | 100% | 1 |
9 | AUSTRALIAN MANAGMENET | 36264 | 0% | 100% | 1 |
10 | AZFSM | 36264 | 0% | 100% | 1 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING | 231976 | 12% | 6% | 100 |
2 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | 40701 | 12% | 1% | 97 |
3 | PRODUCTION PLANNING & CONTROL | 20481 | 4% | 2% | 30 |
4 | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 17823 | 2% | 3% | 19 |
5 | COMPUTERS & INDUSTRIAL ENGINEERING | 15168 | 6% | 1% | 47 |
6 | JOURNAL OF INTELLIGENT MANUFACTURING | 10764 | 3% | 1% | 22 |
7 | INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 9156 | 6% | 0% | 53 |
8 | IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING | 7741 | 2% | 1% | 15 |
9 | ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING | 6637 | 2% | 1% | 17 |
10 | INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS | 6365 | 4% | 1% | 31 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | WAFER FABRICATION | 1405557 | 7% | 64% | 61 | Search WAFER+FABRICATION | Search WAFER+FABRICATION |
2 | SEMICONDUCTOR MANUFACTURING | 792302 | 11% | 23% | 95 | Search SEMICONDUCTOR+MANUFACTURING | Search SEMICONDUCTOR+MANUFACTURING |
3 | WAFER FAB | 479959 | 2% | 88% | 15 | Search WAFER+FAB | Search WAFER+FAB |
4 | FUZZY BACK PROPAGATION NETWORK | 372996 | 1% | 86% | 12 | Search FUZZY+BACK+PROPAGATION+NETWORK | Search FUZZY+BACK+PROPAGATION+NETWORK |
5 | CAPACITY PLANNING | 343451 | 7% | 16% | 60 | Search CAPACITY+PLANNING | Search CAPACITY+PLANNING |
6 | FLUCTUATION SMOOTHING | 293735 | 1% | 90% | 9 | Search FLUCTUATION+SMOOTHING | Search FLUCTUATION+SMOOTHING |
7 | CYCLE TIME | 254878 | 5% | 16% | 43 | Search CYCLE+TIME | Search CYCLE+TIME |
8 | MACHINE DEDICATION | 253847 | 1% | 100% | 7 | Search MACHINE+DEDICATION | Search MACHINE+DEDICATION |
9 | OUTPUT TIME PREDICTION | 217583 | 1% | 100% | 6 | Search OUTPUT+TIME+PREDICTION | Search OUTPUT+TIME+PREDICTION |
10 | REMAINING CYCLE TIME | 217583 | 1% | 100% | 6 | Search REMAINING+CYCLE+TIME | Search REMAINING+CYCLE+TIME |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | CHEN, T , ROMANOWSKI, R , (2013) A NOVEL FUZZY-NEURAL SLACK-DIVERSIFYING RULE BASED ON SOFT COMPUTING APPLICATIONS FOR JOB DISPATCHING IN A WAFER FABRICATION FACTORY.MATHEMATICAL PROBLEMS IN ENGINEERING. VOL. . ISSUE . P. - | 31 | 94% | 0 |
2 | WU, HC , CHEN, T , (2013) A FUZZY-NEURAL ENSEMBLE AND GEOMETRIC RULE FUSION APPROACH FOR SCHEDULING A WAFER FABRICATION FACTORY.MATHEMATICAL PROBLEMS IN ENGINEERING. VOL. . ISSUE . P. - | 26 | 93% | 3 |
3 | MARTINEZ-COSTA, C , MAS-MACHUCA, M , BENEDITO, E , COROMINAS, A , (2014) A REVIEW OF MATHEMATICAL PROGRAMMING MODELS FOR STRATEGIC CAPACITY PLANNING IN MANUFACTURING.INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS. VOL. 153. ISSUE . P. 66 -85 | 38 | 55% | 9 |
4 | KIM, SH , LEE, YH , (2016) SYNCHRONIZED PRODUCTION PLANNING AND SCHEDULING IN SEMICONDUCTOR FABRICATION.COMPUTERS & INDUSTRIAL ENGINEERING. VOL. 96. ISSUE . P. 72 -85 | 25 | 78% | 0 |
5 | CHEN, T , (2012) A FUZZY-NEURAL DBD APPROACH FOR JOB SCHEDULING IN A WAFER FABRICATION FACTORY.INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL. VOL. 8. ISSUE 6. P. 4025-4044 | 22 | 92% | 0 |
6 | FORDYCE, K , MILNE, RJ , WANG, CT , ZISGEN, H , (2015) MODELING AND INTEGRATION OF PLANNING, SCHEDULING, AND EQUIPMENT CONFIGURATION IN SEMICONDUCTOR MANUFACTURING PART I. REVIEW OF SUCESSES AND OPPORTUNITIES.INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE. VOL. 22. ISSUE 5. P. 575 -600 | 35 | 52% | 0 |
7 | WANG, YC , CHEN, T , LIN, CW , (2013) A SLACK-DIVERSIFYING NONLINEAR FLUCTUATION SMOOTHING RULE FOR JOB DISPATCHING IN A WAFER FABRICATION FACTORY.ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING. VOL. 29. ISSUE 3. P. 41-47 | 18 | 100% | 0 |
8 | CHEN, T , (2016) ESTIMATING JOB CYCLE TIME IN A WAFER FABRICATION FACTORY: A NOVEL AND EFFECTIVE APPROACH BASED ON POST-CLASSIFICATION.APPLIED SOFT COMPUTING. VOL. 40. ISSUE . P. 558 -568 | 20 | 83% | 0 |
9 | TU, YM , LU, CW , (2014) A MODEL BASED QUEUING THEORY TO DETERMINE THE CAPACITY SUPPORT FOR TWIN-FAB OF WAFER FABRICATION.INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE. VOL. 21. ISSUE 2. P. 22 -38 | 18 | 95% | 0 |
10 | GENG, N , JIANG, ZB , (2009) A REVIEW ON STRATEGIC CAPACITY PLANNING FOR THE SEMICONDUCTOR MANUFACTURING INDUSTRY.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 47. ISSUE 13. P. 3639-3655 | 23 | 77% | 31 |
Classes with closest relation at Level 1 |