Class information for:
Level 1: ECONOMIC LOT SCHEDULING PROBLEM//ELSP//ECONOMIC LOT SCHEDULING

Basic class information

Class id #P Avg. number of
references
Database coverage
of references
23861 332 21.2 52%



Bar chart of Publication_year

Last years might be incomplete

Hierarchy of classes

The table includes all classes above and classes immediately below the current class.



Cluster id Level Cluster label #P
9 4 COMPUTER SCIENCE, THEORY & METHODS//COMPUTER SCIENCE, ARTIFICIAL INTELLIGENCE//COMPUTER SCIENCE, INFORMATION SYSTEMS 1247339
75 3       OPERATIONS RESEARCH & MANAGEMENT SCIENCE//ENGINEERING, INDUSTRIAL//EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 81966
245 2             SUPPLY CHAIN MANAGEMENT//OPERATIONS RESEARCH & MANAGEMENT SCIENCE//INVENTORY 19876
23861 1                   ECONOMIC LOT SCHEDULING PROBLEM//ELSP//ECONOMIC LOT SCHEDULING 332

Terms with highest relevance score



rank Term termType Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 ECONOMIC LOT SCHEDULING PROBLEM authKW 1915662 8% 77% 27
2 ELSP authKW 1241632 5% 75% 18
3 ECONOMIC LOT SCHEDULING authKW 766441 3% 83% 10
4 TIME VARYING LOT SIZES APPROACH authKW 367894 1% 100% 4
5 LOT SCHEDULING authKW 321900 2% 50% 7
6 MPAE address 281661 2% 44% 7
7 COMMON CYCLE APPROACH authKW 275920 1% 100% 3
8 FLEXIBLE PRODUCTION RATE authKW 275920 1% 100% 3
9 LOT AND DELIVERY SCHEDULING authKW 275920 1% 100% 3
10 STOCHASTIC ECONOMIC LOT SCHEDULING PROBLEM authKW 275920 1% 100% 3

Web of Science journal categories



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 Operations Research & Management Science 41494 80% 0% 264
2 Engineering, Industrial 25965 48% 0% 160
3 Engineering, Manufacturing 19826 42% 0% 140
4 Management 1793 16% 0% 54
5 Computer Science, Interdisciplinary Applications 202 7% 0% 24
6 Automation & Control Systems 199 5% 0% 18
7 Engineering, General 27 3% 0% 9
8 Robotics 11 1% 0% 2
9 Mathematics, Applied 10 4% 0% 12
10 Engineering, Mechanical 10 3% 0% 9

Address terms



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 MPAE 281661 2% 44% 7
2 IBDK 137957 1% 50% 3
3 GIPC GRP PROD QUAL 91973 0% 100% 1
4 IND SYST ENGN OPERAT PROGRAM 91973 0% 100% 1
5 ROGLE E GRP REENGN OPERAT MANAGEMENT GRP WORK 91973 0% 100% 1
6 SCI ADM RECH GEST LOGIST GRP 91973 0% 100% 1
7 SERV ORIENTAT RECH COMPETIT INT INGN ENTR 91973 0% 100% 1
8 SERV ORIENTAT RECH COMPETITIVITE INT INGE 91973 0% 100% 1
9 SUPPLY CHAIN MANAGEMENT 580C 91973 0% 100% 1
10 NETWORK ORG TECHNOL 63975 1% 17% 4

Journals



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 42248 19% 1% 62
2 INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS 24415 11% 1% 38
3 IIE TRANSACTIONS 17352 7% 1% 22
4 PRODUCTION PLANNING & CONTROL 9756 4% 1% 13
5 OPERATIONS RESEARCH 7819 5% 1% 17
6 EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 5992 9% 0% 31
7 NAVAL RESEARCH LOGISTICS 4511 3% 0% 10
8 MANAGEMENT SCIENCE 3240 4% 0% 13
9 EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING 2848 1% 1% 3
10 ENGINEERING COSTS AND PRODUCTION ECONOMICS 2339 1% 1% 3

Author Key Words



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
LCSH search Wikipedia search
1 ECONOMIC LOT SCHEDULING PROBLEM 1915662 8% 77% 27 Search ECONOMIC+LOT+SCHEDULING+PROBLEM Search ECONOMIC+LOT+SCHEDULING+PROBLEM
2 ELSP 1241632 5% 75% 18 Search ELSP Search ELSP
3 ECONOMIC LOT SCHEDULING 766441 3% 83% 10 Search ECONOMIC+LOT+SCHEDULING Search ECONOMIC+LOT+SCHEDULING
4 TIME VARYING LOT SIZES APPROACH 367894 1% 100% 4 Search TIME+VARYING+LOT+SIZES+APPROACH Search TIME+VARYING+LOT+SIZES+APPROACH
5 LOT SCHEDULING 321900 2% 50% 7 Search LOT+SCHEDULING Search LOT+SCHEDULING
6 COMMON CYCLE APPROACH 275920 1% 100% 3 Search COMMON+CYCLE+APPROACH Search COMMON+CYCLE+APPROACH
7 FLEXIBLE PRODUCTION RATE 275920 1% 100% 3 Search FLEXIBLE+PRODUCTION+RATE Search FLEXIBLE+PRODUCTION+RATE
8 LOT AND DELIVERY SCHEDULING 275920 1% 100% 3 Search LOT+AND+DELIVERY+SCHEDULING Search LOT+AND+DELIVERY+SCHEDULING
9 STOCHASTIC ECONOMIC LOT SCHEDULING PROBLEM 275920 1% 100% 3 Search STOCHASTIC+ECONOMIC+LOT+SCHEDULING+PROBLEM Search STOCHASTIC+ECONOMIC+LOT+SCHEDULING+PROBLEM
10 COMMON CYCLE SCHEDULING 183947 1% 100% 2 Search COMMON+CYCLE+SCHEDULING Search COMMON+CYCLE+SCHEDULING

Core articles

The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c:
(1) Number of references referring to publications in the class.
(2) Share of total number of active references referring to publications in the class.
(3) Age of the article. New articles get higher score than old articles.
(4) Citation rate, normalized to year.



Rank Reference # ref.
in cl.
Shr. of ref. in
cl.
Citations
1 SANTANDER-MERCADO, A , JUBIZ-DIAZ, M , (2016) THE ECONOMIC LOT SCHEDULING PROBLEM: A SURVEY.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 54. ISSUE 16. P. 4973 -4992 55 85% 0
2 HOLMBOM, M , SEGERSTEDT, A , (2014) ECONOMIC ORDER QUANTITIES IN PRODUCTION: FROM HARRIS TO ECONOMIC LOT SCHEDULING PROBLEMS.INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS. VOL. 155. ISSUE . P. 82 -90 26 84% 5
3 DOUSTHAGHI, S , TAVAKKOLI-MOGHADDAM, R , MAKUI, A , (2013) SOLVING THE ECONOMIC LOT AND DELIVERY SCHEDULING PROBLEM IN A FLEXIBLE JOB SHOP WITH UNRELATED PARALLEL MACHINES AND A SHELF LIFE BY A PROPOSED HYBRID PSO.INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY. VOL. 68. ISSUE 5-8. P. 1401 -1416 27 77% 1
4 BAE, H , MOON, I , YUN, W , (2014) ECONOMIC LOT AND SUPPLY SCHEDULING PROBLEM: A TIME-VARYING LOT SIZES APPROACH.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 52. ISSUE 8. P. 2422 -2435 22 92% 1
5 SALVIETTI, L , SMITH, NR , CARDENAS-BARRON, LE , (2014) A STOCHASTIC PROFIT-MAXIMISING ECONOMIC LOT SCHEDULING PROBLEM WITH PRICE OPTIMISATION.EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING. VOL. 8. ISSUE 2. P. 193-221 24 77% 3
6 ADELMAN, D , BARZ, C , (2014) A PRICE-DIRECTED HEURISTIC FOR THE ECONOMIC LOT SCHEDULING PROBLEM.IIE TRANSACTIONS. VOL. 46. ISSUE 12. P. 1343 -1356 26 72% 1
7 SHIRODKAR, VA , PILLAI, VM , SRIDHARAN, R , (2011) ON THE FEASIBILITY OF SEQUENCE-DEPENDENT ECONOMIC LOT SCHEDULING PROBLEM.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 49. ISSUE 10. P. 2925 -2939 22 88% 5
8 MOHAMMADI, M , MUSA, SN , BAHREININEJAD, A , (2014) OPTIMIZATION OF MIXED INTEGER NONLINEAR ECONOMIC LOT SCHEDULING PROBLEM WITH MULTIPLE SETUPS AND SHELF LIFE USING METAHEURISTIC ALGORITHMS.ADVANCES IN ENGINEERING SOFTWARE. VOL. 78. ISSUE . P. 41 -51 22 79% 2
9 RAZA, SA , AKGUNDUZ, A , CHEN, MY , (2006) A TABU SEARCH ALGORITHM FOR SOLVING ECONOMIC LOT SCHEDULING PROBLEM.JOURNAL OF HEURISTICS. VOL. 12. ISSUE 6. P. 413-426 25 83% 9
10 HOLMBOM, M , SEGERSTEDT, A , VAN DER SLUIS, E , (2013) A SOLUTION PROCEDURE FOR ECONOMIC LOT SCHEDULING PROBLEMS EVEN IN HIGH UTILISATION FACILITIES.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 51. ISSUE 12. P. 3765-3777 20 87% 2

Classes with closest relation at Level 1



Rank Class id link
1 6537 LOT SIZING//CAPACITATED LOT SIZING//LOT SIZING AND SCHEDULING
2 16262 INVENTORY ROUTING//JOINT REPLENISHMENT//INVENTORY ROUTING PROBLEM
3 659 INVENTORY//DETERIORATING ITEMS//EOQ
4 18885 AGGREGATE PRODUCTION PLANNING//HIERARCHICAL PRODUCTION PLANNING//CLEARING FUNCTIONS
5 17511 PROD SYST DESIGN CONTROL//HEDGING POINT POLICY//AUTOMATED PROD ENGN
6 14353 KANBAN//CONWIP//KANBAN SYSTEM
7 2596 SPARE PARTS//INTERMITTENT DEMAND//MULTI ECHELON
8 12070 BATCH PROCESSING MACHINE//BATCHING//SUPPLY CHAIN SCHEDULING
9 3167 FLOW SHOP//FLOW SHOP SCHEDULING//MAKESPAN
10 19701 CLUSTER TOOL//ROBOTIC CELL//CYCLIC SCHEDULING

Go to start page