Class information for:
Level 1: WORKLOAD CONTROL//ORDER ACCEPTANCE//ORDER RELEASE

Basic class information

Class id #P Avg. number of
references
Database coverage
of references
16977 624 28.0 50%



Bar chart of Publication_year

Last years might be incomplete

Hierarchy of classes

The table includes all classes above and classes immediately below the current class.



Cluster id Level Cluster label #P
9 4 COMPUTER SCIENCE, THEORY & METHODS//COMPUTER SCIENCE, ARTIFICIAL INTELLIGENCE//COMPUTER SCIENCE, INFORMATION SYSTEMS 1247339
75 3       OPERATIONS RESEARCH & MANAGEMENT SCIENCE//ENGINEERING, INDUSTRIAL//EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 81966
326 2             SCHEDULING//INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//OPERATIONS RESEARCH & MANAGEMENT SCIENCE 18157
16977 1                   WORKLOAD CONTROL//ORDER ACCEPTANCE//ORDER RELEASE 624

Terms with highest relevance score



rank Term termType Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 WORKLOAD CONTROL authKW 2209297 9% 82% 55
2 ORDER ACCEPTANCE authKW 1044853 5% 65% 33
3 ORDER RELEASE authKW 913409 4% 67% 28
4 AVAILABLE TO PROMISE authKW 706592 3% 76% 19
5 WORKLOAD CONTROL WLC authKW 636137 2% 100% 13
6 MAKE TO ORDER MANUFACTURING authKW 458741 2% 63% 15
7 ORDER PROMISING authKW 376408 2% 77% 10
8 DUE DATE QUOTATION authKW 342535 1% 100% 7
9 MAKE TO ORDER authKW 292356 4% 22% 27
10 PRODUCTION PLANNING AND CONTROL PPC authKW 284700 1% 73% 8

Web of Science journal categories



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 Engineering, Industrial 66601 56% 0% 351
2 Operations Research & Management Science 65792 73% 0% 456
3 Engineering, Manufacturing 55596 51% 0% 321
4 Management 1904 12% 0% 77
5 Computer Science, Interdisciplinary Applications 1310 13% 0% 80
6 Automation & Control Systems 116 3% 0% 20
7 Engineering, General 78 3% 0% 20
8 Computer Science, Artificial Intelligence 40 3% 0% 17
9 Engineering, Marine 17 0% 0% 2
10 Computer Science, Information Systems 15 2% 0% 12

Address terms



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 OPERAT PLANNING CONTROL 101939 1% 42% 5
2 MFG SYST PROD PROC PLANNING 97867 0% 100% 2
3 LANCASTER UNIV MANAGEMENT 80064 1% 27% 6
4 GUANGDONG CIMS PROV 71171 1% 36% 4
5 INVEST GESTIO ENGN PROD CIGIP 65243 0% 67% 2
6 SMA NTU OFF 55047 0% 38% 3
7 AFAV EXPERT 48934 0% 100% 1
8 ALGORITMI UNIT 48934 0% 100% 1
9 ATES 48934 0% 100% 1
10 BUSINESS ECON MANAGEMENT OPERAT 48934 0% 100% 1

Journals



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
1 INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 108203 22% 2% 136
2 INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS 74544 15% 2% 91
3 PRODUCTION PLANNING & CONTROL 54241 7% 3% 42
4 CONTROL SOLUTIONS INTERNATIONAL 48934 0% 100% 1
5 OR SPECTRUM 13272 2% 2% 12
6 COMPUTERS & INDUSTRIAL ENGINEERING 6250 4% 0% 26
7 EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 5828 7% 0% 42
8 IIE TRANSACTIONS 4273 2% 1% 15
9 INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT 4012 2% 1% 11
10 PRODUCTION AND OPERATIONS MANAGEMENT 3669 1% 1% 9

Author Key Words



Rank Term Chi square Shr. of publ. in
class containing
term
Class's shr. of
term's tot. occurrences
#P with
term in
class
LCSH search Wikipedia search
1 WORKLOAD CONTROL 2209297 9% 82% 55 Search WORKLOAD+CONTROL Search WORKLOAD+CONTROL
2 ORDER ACCEPTANCE 1044853 5% 65% 33 Search ORDER+ACCEPTANCE Search ORDER+ACCEPTANCE
3 ORDER RELEASE 913409 4% 67% 28 Search ORDER+RELEASE Search ORDER+RELEASE
4 AVAILABLE TO PROMISE 706592 3% 76% 19 Search AVAILABLE+TO+PROMISE Search AVAILABLE+TO+PROMISE
5 WORKLOAD CONTROL WLC 636137 2% 100% 13 Search WORKLOAD+CONTROL+WLC Search WORKLOAD+CONTROL+WLC
6 MAKE TO ORDER MANUFACTURING 458741 2% 63% 15 Search MAKE+TO+ORDER+MANUFACTURING Search MAKE+TO+ORDER+MANUFACTURING
7 ORDER PROMISING 376408 2% 77% 10 Search ORDER+PROMISING Search ORDER+PROMISING
8 DUE DATE QUOTATION 342535 1% 100% 7 Search DUE+DATE+QUOTATION Search DUE+DATE+QUOTATION
9 MAKE TO ORDER 292356 4% 22% 27 Search MAKE+TO+ORDER Search MAKE+TO+ORDER
10 PRODUCTION PLANNING AND CONTROL PPC 284700 1% 73% 8 Search PRODUCTION+PLANNING+AND+CONTROL+PPC Search PRODUCTION+PLANNING+AND+CONTROL+PPC

Core articles

The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c:
(1) Number of references referring to publications in the class.
(2) Share of total number of active references referring to publications in the class.
(3) Age of the article. New articles get higher score than old articles.
(4) Citation rate, normalized to year.



Rank Reference # ref.
in cl.
Shr. of ref. in
cl.
Citations
1 THURER, M , STEVENSON, M , SILVA, C , (2011) THREE DECADES OF WORKLOAD CONTROL RESEARCH: A SYSTEMATIC REVIEW OF THE LITERATURE.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 49. ISSUE 23. P. 6905-6935 78 91% 13
2 THURER, M , SILVA, C , STEVENSON, M , (2010) WORKLOAD CONTROL RELEASE MECHANISMS: FROM PRACTICE BACK TO THEORY BUILDING.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 48. ISSUE 12. P. 3593-3617 40 93% 9
3 STEVENSON, M , HUANG, Y , HENDRY, LC , SOEPENBERG, E , (2011) THE THEORY AND PRACTICE OF WORKLOAD CONTROL: A RESEARCH AGENDA AND IMPLEMENTATION STRATEGY.INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS. VOL. 131. ISSUE 2. P. 689-700 41 87% 11
4 THURER, M , STEVENSON, M , (2016) WORKLOAD CONTROL IN JOB SHOPS WITH RE-ENTRANT FLOWS: AN ASSESSMENT BY SIMULATION.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 54. ISSUE 17. P. 5136 -5150 36 82% 1
5 FRAMINAN, JM , LEISTEN, R , (2010) AVAILABLE-TO-PROMISE (ATP) SYSTEMS: A CLASSIFICATION AND FRAMEWORK FOR ANALYSIS.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 48. ISSUE 11. P. 3079-3103 56 58% 13
6 SLOTNICK, SA , (2011) ORDER ACCEPTANCE AND SCHEDULING: A TAXONOMY AND REVIEW.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 212. ISSUE 1. P. 1 -11 51 51% 56
7 CRANSBERG, V , LAND, M , HICKS, C , STEVENSON, M , (2016) HANDLING THE COMPLEXITIES OF REAL-LIFE JOB SHOPS WHEN IMPLEMENTING WORKLOAD CONTROL: A DECISION FRAMEWORK AND CASE STUDY.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 54. ISSUE 4. P. 1094 -1109 33 80% 0
8 THURER, M , STEVENSON', M , SILVA, C , LAND, MJ , FREDENDALL, LD , (2012) WORKLOAD CONTROL AND ORDER RELEASE: A LEAN SOLUTION FOR MAKE-TO-ORDER COMPANIES.PRODUCTION AND OPERATIONS MANAGEMENT. VOL. 21. ISSUE 5. P. 939-953 28 97% 12
9 THURER, M , STEVENSON, M , SILVA, C , LAND, M , (2013) TOWARDS AN INTEGRATED WORKLOAD CONTROL (WLC) CONCEPT: THE PERFORMANCE OF DUE DATE SETTING RULES IN JOB SHOPS WITH CONTINGENT ORDERS.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 51. ISSUE 15. P. 4502-4516 29 91% 2
10 THURER, M , SILVA, C , STEVENSON, M , (2011) OPTIMISING WORKLOAD NORMS: THE INFLUENCE OF SHOP FLOOR CHARACTERISTICS ON SETTING WORKLOAD NORMS FOR THE WORKLOAD CONTROL CONCEPT.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 49. ISSUE 4. P. 1151 -1171 28 97% 5

Classes with closest relation at Level 1



Rank Class id link
1 18885 AGGREGATE PRODUCTION PLANNING//HIERARCHICAL PRODUCTION PLANNING//CLEARING FUNCTIONS
2 13373 WAFER FABRICATION//IND ENGN SYST MANAGEMENT//SEMICONDUCTOR MANUFACTURING
3 2739 JOB SHOP SCHEDULING//FLEXIBLE JOB SHOP SCHEDULING//JOB SHOP SCHEDULING PROBLEM
4 35296 TIMEGATE//BENCHMARKING FOR CONCURRENT ENGINEERING//BRITISH STANDARDS INSTITUTE BSI STANDARDS
5 14353 KANBAN//CONWIP//KANBAN SYSTEM
6 16305 EQUILIBRIUM STRATEGIES//SOCIAL OPTIMIZATION//BALKING
7 18103 THEORY OF CONSTRAINTS//ACTIVITY BASED COSTING//THEORY OF CONSTRAINTS TOC
8 777 SINGLE MACHINE//DETERIORATING JOBS//SCHEDULING
9 6537 LOT SIZING//CAPACITATED LOT SIZING//LOT SIZING AND SCHEDULING
10 26150 STEELMAKING CONTINUOUS CASTING//HOT ROLLING PRODUCTION SCHEDULING//DUE DATE ESTIMATION

Go to start page