Skip to main content
Back to KTH start page

Selected Technical Reports

(Career total: 42)

  • J. Váncza, Z. Kemény, L. Wang and X. V. Wang, "Human-Robot Collaboration in Manufacturing: A Multi-Agent View," 2020 Intelligent Manufacturing Report, pp.190-207, October 2020.
  • L. Wang, "Advances in Cyber-Physical Systems," 2019 Intelligent Manufacturing Report, pp.48-59, October 2019.
  • A. Mohammed, M. Givehchi and L. Wang, "Interfacing Image Processing with Robot Sketching," Technical Report of a Robot Sketching Project, pp.1-64, February, 2012.
  • L. Wang and M. Givehchi, "Function Block Enabled Adaptive Distributed Process Planning," Technical Report of a Pre-study for Sandvik Coromant, pp.1-56, February 2011.
  • S. Keshavarzmanesh, L. Wang and H.-Y. Feng, "Adaptive Assembly Process Planning and Control Using Function Blocks," NSERC Discovery Project Technical Report, pp.1-107, August 2010.
  • J. M. H. de Mendoza Rosas, E. B. Muñoz, E. R. Zúñiga, P. G. Ruiz, C. B. Ibañez, L. Wang, M. Holm and M. Givehchi, "Linking Wise-ShopFloor to an ABB IRB-140 Robot," A Final Year Project Technical Report, pp.1-59, July 2010.
  • N. Cai, L. Wang and H.-Y. Feng, "Adaptive Setup Planning and Dispatching for Machining Job Shop Operations," NSERC Discovery Project Technical Report, pp.1-77, October 2008.
  • L. Wang, H.-Y. Feng and J. Ma, "Design and Development of a Web-based Distributed Process Planning System," NSERC Discovery Project Technical Report, pp.1-35, August 2008.
  • Z. M. Bi, L. Wang and S. Lang, "Current Status of Reconfigurable Assembly Systems," NRC-IMTI Technical Report, pp.1-28, July 2007.
  • L. Wang and S. Keshavarzmanesh, "Literature Review of Assembly Process Planning and Its Future Trends," NRC-IMTI Technical Report, IMTI-TR-038(2007/07), pp.1-27, July 2007.
  • A. Nace and L. Wang, "Progress Report on Wise-ShopFloor V1.12, V3.00 and V3.10," NRC-IMTI Controlled Technical Report, pp.1-65, 2006.
  • C. Song, L. Wang and H.-Y. Feng, "Function Block Enabled Operation Planning and Monitoring in Distributed Process Planning," NRC-IMTI Controlled Technical Report, pp.1-65, 2006.
  • L. Wang, Q. Gao and Y. Song, "UML Modeling and Java Implementation of DPP," NRC-IMTI Technical Report, pp.1-25, 2005.
  • W. Jin, L. Wang and H.-Y. Feng, "Resource-Driven Process Planning in DPP Focusing on Function Block Realization," NRC-IMTI Controlled Technical Report, pp.1-63, 2005.
  • L. Wang, W. Jin and H.-Y. Feng, "Function Block Design in DPP," NRC-IMTI Technical Report, pp.1-36, 2005.
  • L. Wang, "An Interim Report of Advanced Planning and Control in Manufacturing," NRC-NSC Joint Research Project Report, pp.1-18, October 2004.
  • L. Wang and A. Cunningham, "Java Servlets Implementation for Wise-ShopFloor," NRC-IMTI Controlled Technical Report, IMTI-CTR-110(2004/04), pp.1-64, April 2004.
  • N. Cai, L. Wang and H.-Y. Feng, "Machining Feature Based Reasoning for Setup Planning and Process Sequencing in DPP," NRC-IMTI Controlled Technical Report, IMTI-CTR-109(2004/04), pp.1-67, April 2004.
  • L. Wang, N. Cai and H.-Y. Feng, "Supervisory Planning in DPP," NRC-IMTI Technical Report, IMTI-TR-024(2004/02), pp.1-34, February 2004.
  • L. Wang, H. Song and A. Cunningham, "Development of Wise-ShopFloor for Web-based Monitoring and Control," NRC-IMTI Technical Report, IMTI-TR-023(2004/02), pp.1-33, February 2004.
  • L. Wang, Q. Hao, W. Shen and S. Lang, "1st Year Progress Report on Architecture Design of Distributed Planning and Control," NRC-IMTI Technical Report, IMTI-TR-020(2003/07), pp.1-42, July 2003.
  • L. Wang, Q. Hao, W. Shen and S. Lang, "Research on Advanced Distributed Planning and Control in Manufacturing," NRC-IMTI Controlled Technical Report, IMTI-CTR-079(2003/07), pp.1-70, July 2003.
  • Q. Hao, W. Shen, L. Wang and S. Lang, "Cooperative Scheduling for Inter-Enterprise Manufacturing Resources Sharing," COVE Newsletters, No.5, pp.7-16, February 2003.
  • G. Stecca, W. Shen, L. Wang, B. Wong and Q. Hao, "Integration of an Agent-Based Manufacturing Scheduling System with the eShopFloor Environment," NRC-IMTI Controlled Technical Report, IMTI-CTR-048(2003/02), pp.1-18, February 2003.
  • U. Demirci, W. Shen, L. Wang and P. Orban, "Connecting CNC Machines to Agent-Based Manufacturing Scheduling Systems," NRC-IMTI General Report, IMTI-GR-050(2003/02), pp.1-35, February 2003.
  • U. Demirci, W. Shen, L. Wang and P. Orban, "A Survey of Products/Devices for Connecting CNC Machines to Networks," NRC-IMTI Technical Report, IMTI-TR-013(2003/02), pp.1-61, February 2003.
  • W. Shen and L. Wang, "Agent-Based Distributed Manufacturing Process Planning and Scheduling: a State-of-the-Art Survey," NRC-IMTI Controlled Technical Report, IMTI-CTR-053(2003/02), pp.1-24, February 2003.
  • L. Wang, H.-Y. Feng and N. Cai, "Approach to Distributed Process Planning and Its Architecture Design," NRC-IMTI Technical Report, IMTI-TR-009(2002/08), pp.1-29, August 2002.
  • L. Wang and R. Sams, "A Web-based Digital Shop Floor Using Java 3D," NRC-IMTI Technical Report, IMTI-TR-005(2002/03), pp.1-18, March 2002.
  • L. Wang, W. Shen, H. Xie, J. Neelamkavil and A. Pardasani, "Collaborative Conceptual Design - State of the Art and Future Research Topics," Literature Survey Report on Concurrent Engineering at IMTI/NRC, pp.1-69, March 2000.