Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
26150 | 262 | 18.7 | 47% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | STEELMAKING CONTINUOUS CASTING | authKW | 828777 | 3% | 89% | 8 |
2 | HOT ROLLING PRODUCTION SCHEDULING | authKW | 466188 | 2% | 100% | 4 |
3 | DUE DATE ESTIMATION | authKW | 349641 | 1% | 100% | 3 |
4 | HOT ROLLING BATCH SCHEDULING | authKW | 349641 | 1% | 100% | 3 |
5 | LIAONING MFG SYST LOGIST | address | 305122 | 5% | 22% | 12 |
6 | DUE DATE BUFFER | authKW | 233094 | 1% | 100% | 2 |
7 | ENTERPRISE SOLUT BUSINESS GRP | address | 233094 | 1% | 100% | 2 |
8 | FLEXIBLE JOBS | authKW | 233094 | 1% | 100% | 2 |
9 | LOT GROUPING | authKW | 233094 | 1% | 100% | 2 |
10 | SCHEDULING OF CASTING | authKW | 233094 | 1% | 100% | 2 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Operations Research & Management Science | 12262 | 49% | 0% | 128 |
2 | Engineering, Industrial | 7169 | 29% | 0% | 75 |
3 | Engineering, Manufacturing | 5702 | 26% | 0% | 67 |
4 | Management | 637 | 11% | 0% | 29 |
5 | Computer Science, Interdisciplinary Applications | 600 | 13% | 0% | 35 |
6 | Automation & Control Systems | 522 | 10% | 0% | 25 |
7 | Computer Science, Artificial Intelligence | 341 | 10% | 0% | 26 |
8 | Metallurgy & Metallurgical Engineering | 133 | 8% | 0% | 22 |
9 | Engineering, General | 107 | 5% | 0% | 14 |
10 | Computer Science, Theory & Methods | 104 | 6% | 0% | 16 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | LIAONING MFG SYST LOGIST | 305122 | 5% | 22% | 12 |
2 | ENTERPRISE SOLUT BUSINESS GRP | 233094 | 1% | 100% | 2 |
3 | AUTMOT MANAGEMENT IND PROD | 116547 | 0% | 100% | 1 |
4 | BLDG RENEWABLE ENERGY UTILIZAT TECHNOL | 116547 | 0% | 100% | 1 |
5 | IND ENGN SOLUT SECT | 116547 | 0% | 100% | 1 |
6 | INTELLIGEN INFORMAT SYST | 116547 | 0% | 100% | 1 |
7 | IT PL SCI | 116547 | 0% | 100% | 1 |
8 | KNOWLEDGE INFORMATIZAT | 116547 | 0% | 100% | 1 |
9 | MET ERP BUSINESS | 116547 | 0% | 100% | 1 |
10 | MODELLING OPTIMISAT EDULING INTELLIGENT COMP | 116547 | 0% | 100% | 1 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | 10895 | 11% | 0% | 28 |
2 | INTERFACES | 6557 | 4% | 1% | 10 |
3 | JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL | 3681 | 3% | 0% | 9 |
4 | EUROPEAN JOURNAL OF OPERATIONAL RESEARCH | 3153 | 8% | 0% | 20 |
5 | COMPUTERS & OPERATIONS RESEARCH | 2988 | 4% | 0% | 11 |
6 | IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING | 2765 | 2% | 0% | 5 |
7 | COMPUTERS & INDUSTRIAL ENGINEERING | 2665 | 4% | 0% | 11 |
8 | INTERNATIONAL JOURNAL OF SIMULATION MODELLING | 2041 | 1% | 1% | 2 |
9 | ARTIFICIAL INTELLIGENCE IN ENGINEERING | 1861 | 1% | 1% | 2 |
10 | COMPUTER INTEGRATED MANUFACTURING SYSTEMS | 1839 | 1% | 1% | 2 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | STEELMAKING CONTINUOUS CASTING | 828777 | 3% | 89% | 8 | Search STEELMAKING+CONTINUOUS+CASTING | Search STEELMAKING+CONTINUOUS+CASTING |
2 | HOT ROLLING PRODUCTION SCHEDULING | 466188 | 2% | 100% | 4 | Search HOT+ROLLING+PRODUCTION+SCHEDULING | Search HOT+ROLLING+PRODUCTION+SCHEDULING |
3 | DUE DATE ESTIMATION | 349641 | 1% | 100% | 3 | Search DUE+DATE+ESTIMATION | Search DUE+DATE+ESTIMATION |
4 | HOT ROLLING BATCH SCHEDULING | 349641 | 1% | 100% | 3 | Search HOT+ROLLING+BATCH+SCHEDULING | Search HOT+ROLLING+BATCH+SCHEDULING |
5 | DUE DATE BUFFER | 233094 | 1% | 100% | 2 | Search DUE+DATE+BUFFER | Search DUE+DATE+BUFFER |
6 | FLEXIBLE JOBS | 233094 | 1% | 100% | 2 | Search FLEXIBLE+JOBS | Search FLEXIBLE+JOBS |
7 | LOT GROUPING | 233094 | 1% | 100% | 2 | Search LOT+GROUPING | Search LOT+GROUPING |
8 | SCHEDULING OF CASTING | 233094 | 1% | 100% | 2 | Search SCHEDULING+OF+CASTING | Search SCHEDULING+OF+CASTING |
9 | UNFIXED SPECIFICATION | 233094 | 1% | 100% | 2 | Search UNFIXED+SPECIFICATION | Search UNFIXED+SPECIFICATION |
10 | VARIABLE ELECTRICITY PRICE | 233094 | 1% | 100% | 2 | Search VARIABLE+ELECTRICITY+PRICE | Search VARIABLE+ELECTRICITY+PRICE |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | SONG, SH , (2014) AN INTEGRATED FORMULATION FOR HIERARCHICAL CAST DESIGN PROBLEMS IN THE STEEL MAKING INDUSTRY.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 52. ISSUE 5. P. 1443-1454 | 23 | 79% | 0 |
2 | DE SOUZA, MC , GOMES, AC , BRETAS, AMC , RAVETTI, MG , (2016) MODELS FOR SCHEDULING CHARGES IN CONTINUOUS CASTING: APPLICATION TO A BRAZILIAN STEEL PLANT.OPTIMIZATION LETTERS. VOL. 10. ISSUE 4. P. 667 -683 | 18 | 95% | 0 |
3 | PAN, QK , (2016) AN EFFECTIVE CO-EVOLUTIONARY ARTIFICIAL BEE COLONY ALGORITHM FOR STEELMAKING-CONTINUOUS CASTING SCHEDULING.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 250. ISSUE 3. P. 702 -714 | 18 | 67% | 4 |
4 | VANHOUCKE, M , DEBELS, D , (2009) A FINITE-CAPACITY PRODUCTION SCHEDULING PROCEDURE FOR A BELGIAN STEEL COMPANY.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 47. ISSUE 3. P. 561 -584 | 19 | 90% | 5 |
5 | MATTIK, I , AMORIM, P , GUNTHER, HO , (2014) HIERARCHICAL SCHEDULING OF CONTINUOUS CASTERS AND HOT STRIP MILLS IN THE STEEL INDUSTRY: A BLOCK PLANNING APPLICATION.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 52. ISSUE 9. P. 2576-2591 | 18 | 78% | 3 |
6 | SBIHI, A , BELLABDAOUI, A , TEGHEM, J , (2014) SOLVING A MIXED INTEGER LINEAR PROGRAM WITH TIMES SETUP FOR THE STEEL-CONTINUOUS CASTING PLANNING AND SCHEDULING PROBLEM.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. VOL. 52. ISSUE 24. P. 7276 -7296 | 15 | 88% | 2 |
7 | YADOLLAHPOUR, MR , ARBABSHIRANI, B , (2016) A COMPREHENSIVE SOLUTION FOR CONTINUOUS CASTING PRODUCTION PLANNING AND SCHEDULING.INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY. VOL. 82. ISSUE 1-4. P. 211 -226 | 15 | 83% | 0 |
8 | YU, SP , CHAI, TY , TANG, Y , (2016) AN EFFECTIVE HEURISTIC RESCHEDULING METHOD FOR STEELMAKING AND CONTINUOUS CASTING PRODUCTION PROCESS WITH MULTIREFINING MODES.IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS. VOL. 46. ISSUE 12. P. 1675 -1688 | 15 | 71% | 0 |
9 | LONG, JY , ZHENG, Z , GAO, XQ , PARDALOS, PM , (2016) A HYBRID MULTI-OBJECTIVE EVOLUTIONARY ALGORITHM BASED ON NSGA-II FOR PRACTICAL SCHEDULING WITH RELEASE TIMES IN STEEL PLANTS.JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY. VOL. 67. ISSUE 9. P. 1184 -1199 | 14 | 74% | 0 |
10 | CHEN, YW , LU, YZ , GE, M , YANG, GK , PAN, CC , (2012) DEVELOPMENT OF HYBRID EVOLUTIONARY ALGORITHMS FOR PRODUCTION SCHEDULING OF HOT STRIP MILL.COMPUTERS & OPERATIONS RESEARCH. VOL. 39. ISSUE 2. P. 339 -349 | 14 | 74% | 10 |
Classes with closest relation at Level 1 |