Januari 2017
Correction to problem 1 in project assignment AB
The unit for the existing transmission capability in table 2 should be TWh/year (and not TWh/h).
December 2016
Project assignment CD
The last problem of project assignment CD have now been marked and can be picked up from the student office during Tuesday 20 December and Wednesday 21 December. If you cannot come to the student office during these two days you can send me an e-mail and we will scan your marked report for you. However, please notice that scanning of reports is not possible during the period 23 December to 8 January.
Grades from project assignment CD will not be reported until January, as you have the possibility to improve your grade in project assignment AB.
Clarification to problem 1 in project assignment AB
The unit for the costs for grid reinforcements is not stated correctly in the problem text. The values reported in table 2 show the annual cost for building transmission lines capable of transferring 1 TWh/year. Consequently, building a new transmission capability of 1 TWh/year between North and South would cost 10 M¤/year, 2 TWh/year would cost 20 M¤/year, etc.
Project assignment AB
All problems for project assignment AB are now available under the heading "Examination" in the menu to the left.
Please notice that I will not be able to answer questions about the project assignment after 22 December.
Exam and project assignment E
The grade P has been registered and should be visable on KTH My pages for all students who have passed the partial exams. If you have passed the partial exams you do not need to participate in the final exam and it would be good for the student office if you can cancel your registration for the exam.
The grade E has been registered and should be visable on KTH My pages for all students who have completed project assignment E. Please notice that this grade will be updated once project assignments CD and AB have been marked, i.e., the final grade will not be reported until January. If you have not yet completed project assignment E then you need to attend a repetition seminar (please follow the link under the heading "Course registration" in the menu to the left).
Project assignment CD
The third problem of project assignment CD have now been marked and can be picked up from the student office.
November 2016
Project assignment E
It is now possible to sign up for the repetition seminars. Follow the link under the heading "Course registration" in the menu to the left.
Project assignment CD
The last problem is now available under the heading "Examination" in the menu to the left.
The marking of problem 3 has been delayed, because some reports needs further consideration. Please remember that project assignments CD and AB are individual assignments and that you may not discuss solution methods or programming with other students even if you at a later make your own changes and updates to the method or code.
Reading instructions for the compendium
Unfortunately, the new version of the compendium is not yet ready to be published, but the reading instructions in the course syllabus refer to the chapter numbering that will be used in the new edition. The table below shows how chapters will be renumbered.
2011 compendium |
New compendium |
6.1 Problem description |
8 Simulastion of electricity markets |
6.2 Probabilistic production cost simulation |
9 Probabilistic production cost simulation |
Please notice that the normal approximation (section 6.2.6 in the 2011 compendium) is not part of the course and that dispatchable hydro power is an advanced part of the course (i.e., not considered in project assignment E or the exam).