Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
29016 | 194 | 21.6 | 17% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | BEYOND DESIGN BASIS EXTERNAL EVENTS | authKW | 314798 | 1% | 100% | 2 |
2 | EXTERNAL EVENT PSA | authKW | 314798 | 1% | 100% | 2 |
3 | FUSION SAFETY ANALYSIS | authKW | 314798 | 1% | 100% | 2 |
4 | ISAAC CODE | authKW | 314798 | 1% | 100% | 2 |
5 | MAAP CODE | authKW | 209864 | 1% | 67% | 2 |
6 | SITE RISK | authKW | 209864 | 1% | 67% | 2 |
7 | INTEGRATED SAFETY ASSESSMENT | address | 170027 | 6% | 10% | 11 |
8 | INTEGRATED RISK ASSESSMENT | address | 167887 | 2% | 27% | 4 |
9 | ABNORMAL OPERATING PROCEDURE | authKW | 157399 | 1% | 100% | 1 |
10 | ACCIDENT PROGRESSION | authKW | 157399 | 1% | 100% | 1 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Nuclear Science & Technology | 3455 | 39% | 0% | 76 |
2 | Social Sciences, Mathematical Methods | 1190 | 10% | 0% | 19 |
3 | Engineering, Industrial | 1049 | 13% | 0% | 25 |
4 | Social Issues | 826 | 7% | 0% | 13 |
5 | Operations Research & Management Science | 699 | 14% | 0% | 27 |
6 | International Relations | 457 | 7% | 0% | 13 |
7 | Mathematics, Interdisciplinary Applications | 335 | 10% | 0% | 19 |
8 | Energy & Fuels | 105 | 8% | 0% | 16 |
9 | Public, Environmental & Occupational Health | 85 | 10% | 0% | 19 |
10 | Environmental Studies | 48 | 3% | 0% | 6 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | INTEGRATED SAFETY ASSESSMENT | 170027 | 6% | 10% | 11 |
2 | INTEGRATED RISK ASSESSMENT | 167887 | 2% | 27% | 4 |
3 | AIRSPACE AIR NAV REGULAT | 157399 | 1% | 100% | 1 |
4 | BERLIN CASPIAN REGION STUDIES | 157399 | 1% | 100% | 1 |
5 | CLAMART | 157399 | 1% | 100% | 1 |
6 | NUCL ENERGY ENABLING TECHNOL | 157399 | 1% | 100% | 1 |
7 | RADIOL EMERGENCY MANAGEMENT | 157399 | 1% | 100% | 1 |
8 | SAFETY ANALYSIS | 157399 | 1% | 100% | 1 |
9 | SAM NUNN SECUR PROGRAM | 157399 | 1% | 100% | 1 |
10 | SOLAR ENERGY INSITUTE | 157399 | 1% | 100% | 1 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | NUCLEAR ENGINEERING AND TECHNOLOGY | 32257 | 7% | 2% | 13 |
2 | BULLETIN OF THE ATOMIC SCIENTISTS | 24037 | 6% | 1% | 12 |
3 | RISK ANALYSIS | 18684 | 10% | 1% | 19 |
4 | RELIABILITY ENGINEERING & SYSTEM SAFETY | 18103 | 11% | 1% | 22 |
5 | NUCLEAR TECHNOLOGY-FUSION | 7555 | 2% | 1% | 4 |
6 | JOURNAL OF FUSION ENERGY | 5587 | 4% | 1% | 7 |
7 | NUCLEAR ENGINEERING AND DESIGN | 3795 | 8% | 0% | 15 |
8 | ANNUAL REVIEW OF ENERGY | 3721 | 1% | 1% | 2 |
9 | FUSION TECHNOLOGY | 3688 | 5% | 0% | 9 |
10 | POWER ENGINEERING | 1805 | 1% | 1% | 2 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | BEYOND DESIGN BASIS EXTERNAL EVENTS | 314798 | 1% | 100% | 2 | Search BEYOND+DESIGN+BASIS+EXTERNAL+EVENTS | Search BEYOND+DESIGN+BASIS+EXTERNAL+EVENTS |
2 | EXTERNAL EVENT PSA | 314798 | 1% | 100% | 2 | Search EXTERNAL+EVENT+PSA | Search EXTERNAL+EVENT+PSA |
3 | FUSION SAFETY ANALYSIS | 314798 | 1% | 100% | 2 | Search FUSION+SAFETY+ANALYSIS | Search FUSION+SAFETY+ANALYSIS |
4 | ISAAC CODE | 314798 | 1% | 100% | 2 | Search ISAAC+CODE | Search ISAAC+CODE |
5 | MAAP CODE | 209864 | 1% | 67% | 2 | Search MAAP+CODE | Search MAAP+CODE |
6 | SITE RISK | 209864 | 1% | 67% | 2 | Search SITE+RISK | Search SITE+RISK |
7 | ABNORMAL OPERATING PROCEDURE | 157399 | 1% | 100% | 1 | Search ABNORMAL+OPERATING+PROCEDURE | Search ABNORMAL+OPERATING+PROCEDURE |
8 | ACCIDENT PROGRESSION | 157399 | 1% | 100% | 1 | Search ACCIDENT+PROGRESSION | Search ACCIDENT+PROGRESSION |
9 | ACCIDENT WARNINGS | 157399 | 1% | 100% | 1 | Search ACCIDENT+WARNINGS | Search ACCIDENT+WARNINGS |
10 | ADVANCED PRA METHODS | 157399 | 1% | 100% | 1 | Search ADVANCED+PRA+METHODS | Search ADVANCED+PRA+METHODS |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | PARK, S , SONG, Y , (2014) EVALUATIONS OF FISSION PRODUCT REDUCTION STRATEGIES FOR SEVERE ACCIDENT MANAGEMENT IN CANDU6.NUCLEAR SCIENCE AND TECHNIQUES. VOL. 25. ISSUE . P. - | 6 | 100% | 0 |
2 | ZHANG, S , TONG, JJ , ZHAO, J , (2016) AN INTEGRATED MODELING APPROACH FOR EVENT SEQUENCE DEVELOPMENT IN MULTI-UNIT PROBABILISTIC RISK ASSESSMENT.RELIABILITY ENGINEERING & SYSTEM SAFETY. VOL. 155. ISSUE . P. 147 -159 | 7 | 78% | 0 |
3 | SAWADA, T , SAITO, M , INOUE, T , (2001) SELECTION OF DBES FOR ITER EDA 1998 FINAL DESIGN BY GEMSAFE METHODOLOGY.FUSION ENGINEERING AND DESIGN. VOL. 54. ISSUE 3-4. P. 563-573 | 5 | 100% | 0 |
4 | SAWADA, T , SAITO, M , (2001) BLANKET SAFETY BY GEMSAFE METHODOLOGY.JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY. VOL. 38. ISSUE 11. P. 971 -979 | 5 | 100% | 0 |
5 | KIM, J , PARK, SY , AHN, KI , YANG, JE , (2016) IROCS: INTEGRATED ACCIDENT MANAGEMENT FRAMEWORK FOR COPING WITH BEYOND-DESIGN-BASIS EXTERNAL EVENTS.NUCLEAR ENGINEERING AND DESIGN. VOL. 298. ISSUE . P. 1 -13 | 4 | 80% | 0 |
6 | MODARRES, M , ZHOU, TT , MASSOUD, M , (2017) ADVANCES IN MULTI-UNIT NUCLEAR POWER PLANT PROBABILISTIC RISK ASSESSMENT.RELIABILITY ENGINEERING & SYSTEM SAFETY. VOL. 157. ISSUE . P. 87 -100 | 3 | 100% | 0 |
7 | PARK, SY , AHN, KI , (2017) A COMPARISON OF FISSION PRODUCT BEHAVIOR FOR TYPICAL PLWR AND PHWR WITH FCVS OPERATION.ANNALS OF NUCLEAR ENERGY. VOL. 101. ISSUE . P. 99 -108 | 3 | 100% | 0 |
8 | KIM, Y , JANG, SC , LIM, TJ , (2015) HAZARD ANALYSIS OF TYPHOON-RELATED EXTERNAL EVENTS USING EXTREME VALUE THEORY.NUCLEAR ENGINEERING AND TECHNOLOGY. VOL. 47. ISSUE 1. P. 59 -65 | 3 | 100% | 1 |
9 | KUMAR, CS , HASSIJA, V , VELUSAMY, K , BALASUBRAMANIYAN, V , (2015) INTEGRATED RISK ASSESSMENT FOR MULTI-UNIT NPP SITES-A COMPARISON.NUCLEAR ENGINEERING AND DESIGN. VOL. 293. ISSUE . P. 53 -62 | 4 | 67% | 1 |
10 | HO, SK , CAMBI, G , CIATTAGLIA, S , FUJIIE, Y , SEKI, Y , (1994) PROGRESS IN THE DEVELOPMENT OF METHODOLOGY FOR FUSION SAFETY SYSTEMS STUDIES.FUSION TECHNOLOGY. VOL. 26. ISSUE 3. P. 1034-1042 | 5 | 100% | 0 |
Classes with closest relation at Level 1 |