Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
20856 | 443 | 20.8 | 25% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Cluster id | Level | Cluster label | #P |
---|---|---|---|
1 | 4 | ECONOMICS//EDUCATION & EDUCATIONAL RESEARCH//PSYCHOL | 3876184 |
600 | 3 | MATHEMATICAL GEOLOGY//CAPTURE RECAPTURE//DISEASE MAPPING | 14509 |
1865 | 2 | MATHEMATICAL GEOLOGY//MATHEMATICAL GEOSCIENCES//GEOSTATISTICS | 6050 |
20856 | 1 | CUT OFF GRADE//MINE PLANNING//COSMO STOCHAST MINE PLANNING | 443 |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | CUT OFF GRADE | authKW | 1477878 | 6% | 79% | 27 |
2 | MINE PLANNING | authKW | 1141985 | 6% | 61% | 27 |
3 | COSMO STOCHAST MINE PLANNING | address | 834005 | 5% | 55% | 22 |
4 | OPEN PIT MINING | authKW | 574364 | 6% | 33% | 25 |
5 | MINE PRODUCTION SCHEDULING | authKW | 482493 | 2% | 100% | 7 |
6 | OPEN PIT OPTIMIZATION | authKW | 375270 | 2% | 78% | 7 |
7 | MINE SCHEDULING | authKW | 344638 | 1% | 100% | 5 |
8 | DELPHOS MINE PLANNING | address | 275711 | 1% | 100% | 4 |
9 | OPEN PIT | authKW | 215756 | 3% | 26% | 12 |
10 | CEMENT MINING INDUSTRY | authKW | 206783 | 1% | 100% | 3 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Mining & Mineral Processing | 91345 | 47% | 1% | 206 |
2 | Operations Research & Management Science | 4867 | 24% | 0% | 106 |
3 | Metallurgy & Metallurgical Engineering | 854 | 15% | 0% | 68 |
4 | Management | 498 | 8% | 0% | 34 |
5 | Mineralogy | 460 | 5% | 0% | 21 |
6 | Engineering, Industrial | 269 | 5% | 0% | 20 |
7 | METALLURGY & MINING | 254 | 1% | 0% | 4 |
8 | Environmental Studies | 248 | 5% | 0% | 20 |
9 | Computer Science, Interdisciplinary Applications | 115 | 5% | 0% | 22 |
10 | Engineering, General | 85 | 4% | 0% | 17 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | COSMO STOCHAST MINE PLANNING | 834005 | 5% | 55% | 22 |
2 | DELPHOS MINE PLANNING | 275711 | 1% | 100% | 4 |
3 | MINE LECE DOO MEDVEDJA | 137855 | 0% | 100% | 2 |
4 | TECHNOL IND MATH ITMATI | 137855 | 0% | 100% | 2 |
5 | MIN OPTIMIZAT | 91902 | 0% | 67% | 2 |
6 | ANGLO COAL AUSTRALIA PTY LTD | 68928 | 0% | 100% | 1 |
7 | CHAIR GROUND CONTROL ROCK MECH | 68928 | 0% | 100% | 1 |
8 | DFG MATHEON MATH KEY TECHNOL | 68928 | 0% | 100% | 1 |
9 | HEAD MIN ENGN | 68928 | 0% | 100% | 1 |
10 | KWK KONIN | 68928 | 0% | 100% | 1 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY | 96231 | 7% | 4% | 32 |
2 | TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY | 74648 | 3% | 8% | 13 |
3 | TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY | 64014 | 3% | 8% | 12 |
4 | JOURNAL OF MINING SCIENCE | 59135 | 7% | 3% | 30 |
5 | MINERAL RESOURCES ENGINEERING | 59071 | 1% | 14% | 6 |
6 | INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT | 47927 | 3% | 6% | 12 |
7 | JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY | 42011 | 5% | 3% | 23 |
8 | CIM BULLETIN | 41257 | 6% | 2% | 26 |
9 | INTERNATIONAL JOURNAL OF MINING ENGINEERING | 28271 | 1% | 10% | 4 |
10 | ARCHIVES OF MINING SCIENCES | 25272 | 3% | 3% | 14 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | CUT OFF GRADE | 1477878 | 6% | 79% | 27 | Search CUT+OFF+GRADE | Search CUT+OFF+GRADE |
2 | MINE PLANNING | 1141985 | 6% | 61% | 27 | Search MINE+PLANNING | Search MINE+PLANNING |
3 | OPEN PIT MINING | 574364 | 6% | 33% | 25 | Search OPEN+PIT+MINING | Search OPEN+PIT+MINING |
4 | MINE PRODUCTION SCHEDULING | 482493 | 2% | 100% | 7 | Search MINE+PRODUCTION+SCHEDULING | Search MINE+PRODUCTION+SCHEDULING |
5 | OPEN PIT OPTIMIZATION | 375270 | 2% | 78% | 7 | Search OPEN+PIT+OPTIMIZATION | Search OPEN+PIT+OPTIMIZATION |
6 | MINE SCHEDULING | 344638 | 1% | 100% | 5 | Search MINE+SCHEDULING | Search MINE+SCHEDULING |
7 | OPEN PIT | 215756 | 3% | 26% | 12 | Search OPEN+PIT | Search OPEN+PIT |
8 | CEMENT MINING INDUSTRY | 206783 | 1% | 100% | 3 | Search CEMENT+MINING+INDUSTRY | Search CEMENT+MINING+INDUSTRY |
9 | MINE OPTIMIZATION | 206783 | 1% | 100% | 3 | Search MINE+OPTIMIZATION | Search MINE+OPTIMIZATION |
10 | OPEN PIT MINE OPTIMIZATION | 206783 | 1% | 100% | 3 | Search OPEN+PIT+MINE+OPTIMIZATION | Search OPEN+PIT+MINE+OPTIMIZATION |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | ASAD, MWA , QURESHI, MA , JANG, H , (2016) A REVIEW OF CUT-OFF GRADE POLICY MODELS FOR OPEN PIT MINING OPERATIONS.RESOURCES POLICY. VOL. 49. ISSUE . P. 142 -152 | 29 | 91% | 0 |
2 | NEWMAN, AM , RUBIO, E , CARO, R , WEINTRAUB, A , EUREK, K , (2010) A REVIEW OF OPERATIONS RESEARCH IN MINE PLANNING.INTERFACES. VOL. 40. ISSUE 3. P. 222-245 | 27 | 79% | 59 |
3 | BAEK, J , CHOI, Y , PARK, HS , (2016) UNCERTAINTY REPRESENTATION METHOD FOR OPEN PIT OPTIMIZATION RESULTS DUE TO VARIATION IN MINERAL PRICES.MINERALS. VOL. 6. ISSUE 1. P. - | 21 | 91% | 0 |
4 | RAHIMI, E , AKBARI, A , (2016) APPLICATION OF KKT IN DETERMINING THE FINAL DESTINATION OF MINED MATERIAL IN MULTI-PROCESSING MINES.RESOURCES POLICY. VOL. 50. ISSUE . P. 10 -18 | 19 | 95% | 0 |
5 | SHISHVAN, MS , SATTARVAND, J , (2015) LONG TERM PRODUCTION PLANNING OF OPEN PIT MINES BY ANT COLONY OPTIMIZATION.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 240. ISSUE 3. P. 825 -836 | 14 | 93% | 12 |
6 | O'SULLIVAN, D , NEWMAN, A , (2015) OPTIMIZATION-BASED HEURISTICS FOR UNDERGROUND MINE SCHEDULING.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 241. ISSUE 1. P. 248 -259 | 18 | 82% | 2 |
7 | ZHANG, J , DIMITRAKOPOULOS, RG , (2017) A DYNAMIC-MATERIAL-VALUE-BASED DECOMPOSITION METHOD FOR OPTIMIZING A MINERAL VALUE CHAIN WITH UNCERTAINTY.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 258. ISSUE 2. P. 617 -625 | 14 | 100% | 0 |
8 | LAMGHARI, A , DIMITRAKOPOULOS, R , (2016) NETWORK-FLOW BASED ALGORITHMS FOR SCHEDULING PRODUCTION IN MULTI-PROCESSOR OPEN-PIT MINES ACCOUNTING FOR METAL UNCERTAINTY.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 250. ISSUE 1. P. 273 -290 | 15 | 88% | 1 |
9 | LIU, SQ , KOZAN, E , (2016) NEW GRAPH-BASED ALGORITHMS TO EFFICIENTLY SOLVE LARGE SCALE OPEN PIT MINING OPTIMISATION PROBLEMS.EXPERT SYSTEMS WITH APPLICATIONS. VOL. 43. ISSUE . P. 59 -65 | 17 | 68% | 3 |
10 | MOUSAVI, A , KOZAN, E , LIU, SQ , (2016) OPEN-PIT BLOCK SEQUENCING OPTIMIZATION: A MATHEMATICAL MODEL AND SOLUTION TECHNIQUE.ENGINEERING OPTIMIZATION. VOL. 48. ISSUE 11. P. 1932 -1950 | 17 | 81% | 0 |
Classes with closest relation at Level 1 |