Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
221 | 19942 | 25.3 | 51% |
Classes in level above (level 3) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
62 | 87349 | OPERATIONS RESEARCH & MANAGEMENT SCIENCE//EUROPEAN JOURNAL OF OPERATIONAL RESEARCH//MATHEMATICAL PROGRAMMING |
Classes in level below (level 1) |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | Journal | 1417 | 38% | 15% | 2958 |
2 | SINGLE MACHINE | Author keyword | 1016 | 85% | 3% | 533 |
3 | SCHEDULING | Author keyword | 848 | 25% | 15% | 3016 |
4 | MAKESPAN | Author keyword | 481 | 58% | 3% | 549 |
5 | DETERIORATING JOBS | Author keyword | 438 | 91% | 1% | 182 |
6 | FLOW SHOP | Author keyword | 362 | 70% | 2% | 300 |
7 | COMPUTERS & INDUSTRIAL ENGINEERING | Journal | 341 | 25% | 6% | 1190 |
8 | CELLULAR MANUFACTURING | Author keyword | 336 | 72% | 1% | 267 |
9 | IND ENGN | Address | 304 | 12% | 12% | 2301 |
10 | SINGLE MACHINE SCHEDULING | Author keyword | 303 | 73% | 1% | 230 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | SINGLE MACHINE | 1016 | 85% | 3% | 533 | Search SINGLE+MACHINE | Search SINGLE+MACHINE |
2 | SCHEDULING | 848 | 25% | 15% | 3016 | Search SCHEDULING | Search SCHEDULING |
3 | MAKESPAN | 481 | 58% | 3% | 549 | Search MAKESPAN | Search MAKESPAN |
4 | DETERIORATING JOBS | 438 | 91% | 1% | 182 | Search DETERIORATING+JOBS | Search DETERIORATING+JOBS |
5 | FLOW SHOP | 362 | 70% | 2% | 300 | Search FLOW+SHOP | Search FLOW+SHOP |
6 | CELLULAR MANUFACTURING | 336 | 72% | 1% | 267 | Search CELLULAR+MANUFACTURING | Search CELLULAR+MANUFACTURING |
7 | SINGLE MACHINE SCHEDULING | 303 | 73% | 1% | 230 | Search SINGLE+MACHINE+SCHEDULING | Search SINGLE+MACHINE+SCHEDULING |
8 | GROUP TECHNOLOGY | 300 | 68% | 1% | 262 | Search GROUP+TECHNOLOGY | Search GROUP+TECHNOLOGY |
9 | FLOWSHOP | 272 | 77% | 1% | 186 | Search FLOWSHOP | Search FLOWSHOP |
10 | TOTAL COMPLETION TIME | 256 | 85% | 1% | 137 | Search TOTAL+COMPLETION+TIME | Search TOTAL+COMPLETION+TIME |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | SINGLE MACHINE | 1192 | 76% | 4% | 839 |
2 | GROUP TECHNOLOGY | 917 | 83% | 3% | 522 |
3 | MAKESPAN | 781 | 74% | 3% | 573 |
4 | MINIMIZE | 573 | 67% | 3% | 517 |
5 | SEQUENCING PROBLEM | 507 | 77% | 2% | 345 |
6 | SHOP | 505 | 69% | 2% | 427 |
7 | TOTAL COMPLETION TIME | 497 | 88% | 1% | 230 |
8 | 2 MACHINE FLOWSHOP | 468 | 91% | 1% | 191 |
9 | TARDINESS | 467 | 74% | 2% | 344 |
10 | DEPENDENT PROCESSING TIMES | 460 | 88% | 1% | 218 |
Journals |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | 1417 | 38% | 15% | 2958 |
2 | COMPUTERS & INDUSTRIAL ENGINEERING | 341 | 25% | 6% | 1190 |
3 | INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS | 209 | 19% | 5% | 966 |
4 | COMPUTERS & OPERATIONS RESEARCH | 193 | 20% | 4% | 869 |
5 | EUROPEAN JOURNAL OF OPERATIONAL RESEARCH | 191 | 12% | 8% | 1564 |
6 | IIE TRANSACTIONS | 178 | 25% | 3% | 619 |
7 | PRODUCTION PLANNING & CONTROL | 153 | 30% | 2% | 436 |
8 | INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 106 | 10% | 5% | 959 |
9 | JOURNAL OF SCHEDULING | 103 | 39% | 1% | 208 |
10 | JOURNAL OF MANUFACTURING SYSTEMS | 63 | 24% | 1% | 235 |
Reviews |
Title | Publ. year | Cit. | Active references | % act. ref. to same field |
---|---|---|---|---|
A survey of scheduling problems with setup times or costs | 2008 | 362 | 227 | 95% |
A state-of-the-art review on scheduling with learning effects | 2008 | 295 | 35 | 97% |
A concise survey of scheduling with time-dependent processing times | 2004 | 358 | 42 | 98% |
A taxonomy of line balancing problems and their solution approaches | 2013 | 36 | 230 | 92% |
A survey on problems and methods in generalized assembly line balancing | 2006 | 272 | 100 | 94% |
The hybrid flow shop scheduling problem | 2010 | 126 | 190 | 96% |
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing | 2006 | 255 | 52 | 90% |
A review of scheduling research involving setup considerations | 1999 | 380 | 110 | 94% |
A classification of assembly line balancing problems | 2007 | 176 | 118 | 93% |
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective | 2010 | 85 | 139 | 95% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | IND ENGN | 304 | 12% | 12% | 2301 |
2 | IND ENGN SYST MANAGEMENT | 68 | 48% | 0.5% | 105 |
3 | IND MANAGEMENT | 64 | 16% | 1.9% | 373 |
4 | IND ENGN MANAGEMENT | 63 | 10% | 2.8% | 568 |
5 | GRP SISTEMAS OPTIMIZAC LICADA | 52 | 87% | 0.1% | 26 |
6 | OFF VICE P IDENT POST STUDIES | 48 | 91% | 0.1% | 20 |
7 | LOGIST MARITIME STUDIES | 30 | 25% | 0.5% | 104 |
8 | LIAONING MFG SYST LOGIST | 29 | 61% | 0.2% | 31 |
9 | UNITED INFORMAT PROBLEMS | 28 | 40% | 0.3% | 54 |
10 | IND MFG SYST ENGN | 28 | 13% | 1.0% | 193 |
Related classes at same level (level 2) |