Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
9333 | 1097 | 27.4 | 53% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
221 | 19942 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | ASSEMBLY LINE BALANCING | Author keyword | 216 | 70% | 16% | 181 |
2 | MIXED MODEL ASSEMBLY LINE | Author keyword | 69 | 67% | 6% | 62 |
3 | LINE BALANCING | Author keyword | 68 | 56% | 8% | 83 |
4 | MIXED MODEL ASSEMBLY LINES | Author keyword | 45 | 68% | 4% | 39 |
5 | CAR SEQUENCING PROBLEM | Author keyword | 27 | 83% | 1% | 15 |
6 | MIXED MODEL SEQUENCING | Author keyword | 24 | 91% | 1% | 10 |
7 | TWO SIDED ASSEMBLY LINE | Author keyword | 24 | 91% | 1% | 10 |
8 | TWO SIDED ASSEMBLY LINES | Author keyword | 23 | 100% | 1% | 10 |
9 | ASSEMBLY LINES | Author keyword | 22 | 43% | 4% | 39 |
10 | U LINES | Author keyword | 21 | 90% | 1% | 9 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | ASSEMBLY LINE BALANCING | 216 | 70% | 16% | 181 | Search ASSEMBLY+LINE+BALANCING | Search ASSEMBLY+LINE+BALANCING |
2 | MIXED MODEL ASSEMBLY LINE | 69 | 67% | 6% | 62 | Search MIXED+MODEL+ASSEMBLY+LINE | Search MIXED+MODEL+ASSEMBLY+LINE |
3 | LINE BALANCING | 68 | 56% | 8% | 83 | Search LINE+BALANCING | Search LINE+BALANCING |
4 | MIXED MODEL ASSEMBLY LINES | 45 | 68% | 4% | 39 | Search MIXED+MODEL+ASSEMBLY+LINES | Search MIXED+MODEL+ASSEMBLY+LINES |
5 | CAR SEQUENCING PROBLEM | 27 | 83% | 1% | 15 | Search CAR+SEQUENCING+PROBLEM | Search CAR+SEQUENCING+PROBLEM |
6 | MIXED MODEL SEQUENCING | 24 | 91% | 1% | 10 | Search MIXED+MODEL+SEQUENCING | Search MIXED+MODEL+SEQUENCING |
7 | TWO SIDED ASSEMBLY LINE | 24 | 91% | 1% | 10 | Search TWO+SIDED+ASSEMBLY+LINE | Search TWO+SIDED+ASSEMBLY+LINE |
8 | TWO SIDED ASSEMBLY LINES | 23 | 100% | 1% | 10 | Search TWO+SIDED+ASSEMBLY+LINES | Search TWO+SIDED+ASSEMBLY+LINES |
9 | ASSEMBLY LINES | 22 | 43% | 4% | 39 | Search ASSEMBLY+LINES | Search ASSEMBLY+LINES |
10 | U LINES | 21 | 90% | 1% | 9 | Search U+LINES | Search U+LINES |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | TIME PRODUCTION SYSTEMS | 142 | 80% | 8% | 88 |
2 | BALANCING PROBLEM | 109 | 81% | 6% | 65 |
3 | LEVEL SCHEDULES | 107 | 84% | 5% | 58 |
4 | PARALLEL WORKSTATIONS | 103 | 91% | 4% | 42 |
5 | MODEL ASSEMBLY LINES | 87 | 78% | 5% | 57 |
6 | U LINES | 57 | 95% | 2% | 19 |
7 | ASSEMBLY LINES | 41 | 48% | 6% | 62 |
8 | SCHEDULING MIXED MODEL | 17 | 100% | 1% | 8 |
9 | JIT SEQUENCING PROBLEM | 15 | 88% | 1% | 7 |
10 | MACHINING LINES | 14 | 100% | 1% | 7 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references | % act. ref. to same field |
---|---|---|---|---|
A taxonomy of line balancing problems and their solution approaches | 2013 | 36 | 230 | 90% |
A survey on problems and methods in generalized assembly line balancing | 2006 | 272 | 100 | 93% |
A classification of assembly line balancing problems | 2007 | 176 | 118 | 92% |
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing | 2006 | 255 | 52 | 90% |
Assembly line balancing: Which model to use when? | 2008 | 104 | 110 | 89% |
Sequencing mixed-model assembly lines: Survey, classification and model critique | 2009 | 88 | 134 | 90% |
Literature review of assembly line balancing problems | 2014 | 3 | 73 | 95% |
A review of the current applications of genetic algorithms in assembly line balancing | 2008 | 43 | 33 | 76% |
A versatile algorithm for assembly line balancing | 2008 | 19 | 61 | 93% |
A review of the current applications of genetic algorithms in mixed-model assembly line sequencing | 2011 | 4 | 34 | 85% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | CHAIR MANAGEMENT SCI | 12 | 86% | 0.5% | 6 |
2 | LEHRSTUHL OPERAT MANAGEMENT | 10 | 50% | 1.4% | 15 |
3 | IND CONTROL ENGN IOC | 9 | 50% | 1.2% | 13 |
4 | LEHRSTUHL BETRIEBSWIRT AFTLICHE ENT EIDUNGSAN | 6 | 80% | 0.4% | 4 |
5 | CNRS UMR6158 | 5 | 63% | 0.5% | 5 |
6 | NISSAN CHAIR | 4 | 67% | 0.4% | 4 |
7 | CHAIR OPERAT MANAGEMENT | 4 | 56% | 0.5% | 5 |
8 | IND ENGN COMP SCI | 4 | 29% | 1.1% | 12 |
9 | CNRS LIMOS UMR6158 | 3 | 60% | 0.3% | 3 |
10 | EMSE FAYOL | 2 | 67% | 0.2% | 2 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000096925 | PCB ASSEMBLY//PRINTED CIRCUIT BOARD ASSEMBLY//FEEDER ASSIGNMENT |
2 | 0.0000079147 | KANBAN//CONWIP//JUST IN TIME |
3 | 0.0000074022 | CONTROL MFG SYST//PIEZOELECTRIC SWITCHING//INTELLIGENT MFG SYST IMS |
4 | 0.0000068748 | ASSEMBLY PLANNING//ASSEMBLY SEQUENCE PLANNING//ASSEMBLY SEQUENCE GENERATION |
5 | 0.0000068526 | PRODUCTION LINES//BUFFER ALLOCATION//UNRELIABLE MACHINES |
6 | 0.0000050695 | INTERMITTENT PRODUCTION//LEARNING CURVES//LEARNING AND FORGETTING |
7 | 0.0000047380 | FLOWSHOP//LOT STREAMING//MAKESPAN |
8 | 0.0000041563 | AUTOMATED GUIDED VEHICLE SYSTEMS//AUTOMATED GUIDED VEHICLES//AUTOMATED MATERIAL HANDLING SYSTEM |
9 | 0.0000040506 | MIN MAX REGRET//MINMAX REGRET//FUZZY MATROID |
10 | 0.0000039152 | CELLULAR MANUFACTURING//GROUP TECHNOLOGY//CELL FORMATION |