Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
5467 | 1554 | 27.7 | 47% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
221 | 19942 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | JOB SHOP SCHEDULING | Author keyword | 88 | 38% | 12% | 187 |
2 | JOB SHOP | Author keyword | 46 | 32% | 8% | 118 |
3 | FLEXIBLE JOB SHOP SCHEDULING | Author keyword | 34 | 50% | 3% | 50 |
4 | JOB SHOP SCHEDULING PROBLEM | Author keyword | 32 | 43% | 4% | 56 |
5 | FLEXIBLE JOB SHOP | Author keyword | 24 | 48% | 2% | 38 |
6 | FUZZY PROCESSING TIMES | Author keyword | 15 | 71% | 1% | 12 |
7 | FLEXIBLE JOB SHOP SCHEDULING PROBLEM | Author keyword | 14 | 44% | 2% | 24 |
8 | DISPATCHING RULES | Author keyword | 13 | 27% | 3% | 41 |
9 | SHIFTING BOTTLENECK | Author keyword | 11 | 65% | 1% | 11 |
10 | FUZZY COMPLETION TIME | Author keyword | 11 | 100% | 0% | 6 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | JOB SHOP SCHEDULING | 88 | 38% | 12% | 187 | Search JOB+SHOP+SCHEDULING | Search JOB+SHOP+SCHEDULING |
2 | JOB SHOP | 46 | 32% | 8% | 118 | Search JOB+SHOP | Search JOB+SHOP |
3 | FLEXIBLE JOB SHOP SCHEDULING | 34 | 50% | 3% | 50 | Search FLEXIBLE+JOB+SHOP+SCHEDULING | Search FLEXIBLE+JOB+SHOP+SCHEDULING |
4 | JOB SHOP SCHEDULING PROBLEM | 32 | 43% | 4% | 56 | Search JOB+SHOP+SCHEDULING+PROBLEM | Search JOB+SHOP+SCHEDULING+PROBLEM |
5 | FLEXIBLE JOB SHOP | 24 | 48% | 2% | 38 | Search FLEXIBLE+JOB+SHOP | Search FLEXIBLE+JOB+SHOP |
6 | FUZZY PROCESSING TIMES | 15 | 71% | 1% | 12 | Search FUZZY+PROCESSING+TIMES | Search FUZZY+PROCESSING+TIMES |
7 | FLEXIBLE JOB SHOP SCHEDULING PROBLEM | 14 | 44% | 2% | 24 | Search FLEXIBLE+JOB+SHOP+SCHEDULING+PROBLEM | Search FLEXIBLE+JOB+SHOP+SCHEDULING+PROBLEM |
8 | DISPATCHING RULES | 13 | 27% | 3% | 41 | Search DISPATCHING+RULES | Search DISPATCHING+RULES |
9 | SHIFTING BOTTLENECK | 11 | 65% | 1% | 11 | Search SHIFTING+BOTTLENECK | Search SHIFTING+BOTTLENECK |
10 | FUZZY COMPLETION TIME | 11 | 100% | 0% | 6 | Search FUZZY+COMPLETION+TIME | Search FUZZY+COMPLETION+TIME |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | SHIFTING BOTTLENECK | 52 | 65% | 3% | 50 |
2 | DUEDATE | 45 | 83% | 2% | 25 |
3 | MULTIPURPOSE MACHINES | 42 | 73% | 2% | 32 |
4 | SHIFTING BOTTLENECK PROCEDURE | 35 | 62% | 2% | 36 |
5 | DISPATCHING RULES | 20 | 27% | 4% | 65 |
6 | JOB SHOP | 15 | 18% | 5% | 77 |
7 | TUTORIAL SURVEY | 13 | 43% | 1% | 23 |
8 | PROCESSING TIME | 12 | 38% | 2% | 24 |
9 | 3 JOBS | 11 | 100% | 0% | 6 |
10 | JOB SHOP SCHEDULES | 9 | 83% | 0% | 5 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
---|---|---|---|---|
Deterministic job-shop scheduling: Past, present and future | 1999 | 274 | 88 | 66% |
A survey of dynamic scheduling in manufacturing systems | 2009 | 101 | 64 | 53% |
Fuzzy job-shop scheduling problems: A review | 2014 | 1 | 46 | 87% |
Analysis of new niching genetic algorithms for finding multiple solutions in the job shop scheduling | 2012 | 7 | 24 | 71% |
The job shop scheduling problem: Conventional and new solution techniques | 1996 | 152 | 64 | 42% |
Reactive recovery of job shop schedules - A review | 2002 | 33 | 40 | 60% |
An artificial immune system for solving production scheduling problems: a review | 2013 | 1 | 9 | 67% |
Architecture of manufacturing scheduling systems: Literature review and an integrated proposal | 2010 | 7 | 32 | 53% |
A review on evolution of production scheduling with neural networks | 2007 | 28 | 74 | 31% |
A research survey: review of AI solution strategies of job shop scheduling problem | 2015 | 0 | 67 | 66% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | COMP TECHNOL GRP | 11 | 78% | 0.5% | 7 |
2 | FURNITURE MFG MANAGEMENT | 3 | 60% | 0.2% | 3 |
3 | TOTAL TECHNOL | 2 | 40% | 0.3% | 4 |
4 | EXTENDED ENTERPRISES PURDUE | 2 | 33% | 0.3% | 4 |
5 | ALAG PA MANAGEMENT | 1 | 100% | 0.1% | 2 |
6 | AUTOMAT INFORMAT LILLE | 1 | 100% | 0.1% | 2 |
7 | FRE 2487 | 1 | 50% | 0.1% | 2 |
8 | MAHMUDABAD | 1 | 100% | 0.1% | 2 |
9 | PROC MODELLING SIMULAT | 1 | 100% | 0.1% | 2 |
10 | TEXT PAREL TECHNOL MANAGEMENT | 1 | 17% | 0.4% | 6 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000259742 | FLOWSHOP//LOT STREAMING//MAKESPAN |
2 | 0.0000218898 | FLEXIBLE MANUFACTURING SYSTEMS//TOOL SWITCHING//FLEXIBLE MANUFACTURING SYSTEM |
3 | 0.0000181229 | WORKLOAD CONTROL//ORDER RELEASE//WORKLOAD CONTROL WLC |
4 | 0.0000158364 | STEELMAKING CONTINUOUS CASTING//HOT ROLLING PRODUCTION SCHEDULING//SLAB STACK SHUFFLING |
5 | 0.0000151074 | SINGLE MACHINE//DETERIORATING JOBS//LEARNING EFFECT |
6 | 0.0000136782 | WAFER FABRICATION//IND ENGN SYST MANAGEMENT//FUZZY BACK PROPAGATION NETWORK |
7 | 0.0000109225 | BATCH PROCESSING MACHINE//BATCH PROCESSING MACHINES//BATCHING |
8 | 0.0000104592 | MIN MAX REGRET//MINMAX REGRET//FUZZY MATROID |
9 | 0.0000081409 | PROJECT SCHEDULING//RESOURCE CONSTRAINED PROJECT SCHEDULING//TIME COST TRADE OFF |
10 | 0.0000078024 | HOIST SCHEDULING//ROBOTIC CELL//CYCLIC SCHEDULING |