Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
3320 | 1935 | 26.2 | 56% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
221 | 19942 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | FLOWSHOP | Author keyword | 94 | 52% | 7% | 127 |
2 | LOT STREAMING | Author keyword | 87 | 76% | 3% | 62 |
3 | MAKESPAN | Author keyword | 81 | 27% | 13% | 256 |
4 | FLOW SHOP | Author keyword | 80 | 39% | 9% | 165 |
5 | FLOWSHOP SCHEDULING | Author keyword | 69 | 57% | 4% | 81 |
6 | FLOW SHOP SCHEDULING | Author keyword | 65 | 49% | 5% | 96 |
7 | HYBRID FLOW SHOP | Author keyword | 55 | 59% | 3% | 62 |
8 | OPEN SHOP | Author keyword | 44 | 51% | 3% | 61 |
9 | NO WAIT | Author keyword | 38 | 51% | 3% | 52 |
10 | TOTAL FLOWTIME | Author keyword | 33 | 63% | 2% | 33 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | FLOWSHOP | 94 | 52% | 7% | 127 | Search FLOWSHOP | Search FLOWSHOP |
2 | LOT STREAMING | 87 | 76% | 3% | 62 | Search LOT+STREAMING | Search LOT+STREAMING |
3 | MAKESPAN | 81 | 27% | 13% | 256 | Search MAKESPAN | Search MAKESPAN |
4 | FLOW SHOP | 80 | 39% | 9% | 165 | Search FLOW+SHOP | Search FLOW+SHOP |
5 | FLOWSHOP SCHEDULING | 69 | 57% | 4% | 81 | Search FLOWSHOP+SCHEDULING | Search FLOWSHOP+SCHEDULING |
6 | FLOW SHOP SCHEDULING | 65 | 49% | 5% | 96 | Search FLOW+SHOP+SCHEDULING | Search FLOW+SHOP+SCHEDULING |
7 | HYBRID FLOW SHOP | 55 | 59% | 3% | 62 | Search HYBRID+FLOW+SHOP | Search HYBRID+FLOW+SHOP |
8 | OPEN SHOP | 44 | 51% | 3% | 61 | Search OPEN+SHOP | Search OPEN+SHOP |
9 | NO WAIT | 38 | 51% | 3% | 52 | Search NO+WAIT | Search NO+WAIT |
10 | TOTAL FLOWTIME | 33 | 63% | 2% | 33 | Search TOTAL+FLOWTIME | Search TOTAL+FLOWTIME |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | SEQUENCING PROBLEM | 267 | 62% | 14% | 277 |
2 | M MACHINE | 259 | 79% | 9% | 166 |
3 | N JOB | 227 | 86% | 6% | 116 |
4 | FLOWSHOPS | 115 | 71% | 5% | 93 |
5 | SHOP | 102 | 37% | 12% | 225 |
6 | MAKESPAN | 92 | 32% | 13% | 243 |
7 | MULTIPLE PROCESSORS | 86 | 77% | 3% | 58 |
8 | 2 MACHINE | 66 | 83% | 2% | 38 |
9 | SHOP SEQUENCING PROBLEM | 60 | 69% | 3% | 51 |
10 | HEURISTIC ALGORITHM | 57 | 36% | 7% | 130 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references | % act. ref. to same field |
---|---|---|---|---|
The hybrid flow shop scheduling problem | 2010 | 126 | 190 | 87% |
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective | 2010 | 85 | 139 | 86% |
Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search | 2015 | 1 | 25 | 68% |
A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime | 2013 | 10 | 33 | 97% |
Flowshop-scheduling problems with makespan criterion: a review | 2005 | 99 | 107 | 89% |
A review of scheduling research involving setup considerations | 1999 | 380 | 110 | 38% |
A survey of machine scheduling problems with blocking and no-wait in process | 1996 | 351 | 49 | 57% |
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective | 2004 | 76 | 39 | 92% |
Multi-objective permutation flow shop scheduling problem: Literature review, classification and current trends | 2014 | 2 | 101 | 90% |
A review and evaluation of multiobjective algorithms for the flowshop scheduling problem | 2008 | 37 | 72 | 82% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | GRP SISTEMAS OPTIMIZAC LICADA | 14 | 57% | 0.9% | 17 |
2 | UNITE RECH OASIS | 6 | 80% | 0.2% | 4 |
3 | TUYSERKANS ENGN | 6 | 100% | 0.2% | 4 |
4 | MANAGEMENT ACCOUNTING | 6 | 14% | 1.9% | 36 |
5 | DECIS SCI INFORMAT SYST | 5 | 22% | 1.0% | 20 |
6 | NOSHAHR BRANCH | 3 | 60% | 0.2% | 3 |
7 | INFORMAT OPERAT TECHNOL MANAGEMENT | 3 | 26% | 0.5% | 9 |
8 | CFINS | 2 | 27% | 0.4% | 7 |
9 | TECNOL INFORMAT | 2 | 13% | 0.7% | 13 |
10 | COMP NETWORK INFORMAT INTEGRAT | 2 | 14% | 0.6% | 11 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000260699 | BATCH PROCESSING MACHINE//BATCH PROCESSING MACHINES//BATCHING |
2 | 0.0000259742 | JOB SHOP SCHEDULING//JOB SHOP//FLEXIBLE JOB SHOP SCHEDULING |
3 | 0.0000189946 | SINGLE MACHINE//DETERIORATING JOBS//LEARNING EFFECT |
4 | 0.0000148712 | HOIST SCHEDULING//ROBOTIC CELL//CYCLIC SCHEDULING |
5 | 0.0000108798 | STEELMAKING CONTINUOUS CASTING//HOT ROLLING PRODUCTION SCHEDULING//SLAB STACK SHUFFLING |
6 | 0.0000092299 | CHROMATIC SUM//MALLEABLE TASKS//UNIT EXECUTION TIMES |
7 | 0.0000076331 | MIN MAX REGRET//MINMAX REGRET//FUZZY MATROID |
8 | 0.0000068453 | PCB ASSEMBLY//PRINTED CIRCUIT BOARD ASSEMBLY//FEEDER ASSIGNMENT |
9 | 0.0000068240 | WORKLOAD CONTROL//ORDER RELEASE//WORKLOAD CONTROL WLC |
10 | 0.0000062430 | WAFER FABRICATION//IND ENGN SYST MANAGEMENT//FUZZY BACK PROPAGATION NETWORK |