Class information for:
Level 1: PROJECT SCHEDULING//RESOURCE CONSTRAINED PROJECT SCHEDULING//TIME COST TRADE OFF

Basic class information

ID Publications Average number
of references
Avg. shr. active
ref. in WoS
2861 2055 26.7 43%



Bar chart of Publication_year

Last years might be incomplete

Classes in level above (level 2)



ID, lev.
above
Publications Label for level above
891 10723 JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE//JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT//AUTOMATION IN CONSTRUCTION

Terms with highest relevance score



Rank Term Type of term Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 PROJECT SCHEDULING Author keyword 336 64% 16% 331
2 RESOURCE CONSTRAINED PROJECT SCHEDULING Author keyword 85 67% 4% 76
3 TIME COST TRADE OFF Author keyword 50 73% 2% 38
4 PROJECT MANAGEMENT AND SCHEDULING Author keyword 33 72% 1% 26
5 MULTI PROJECT SCHEDULING Author keyword 21 78% 1% 14
6 JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE Journal 19 10% 8% 173
7 ACTIVITY NETWORKS Author keyword 17 72% 1% 13
8 RESOURCE LEVELING Author keyword 16 52% 1% 22
9 PERT Author keyword 16 33% 2% 40
10 EARNED VALUE MANAGEMENT Author keyword 16 54% 1% 20

Web of Science journal categories

Author Key Words



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
LCSH search Wikipedia search
1 PROJECT SCHEDULING 336 64% 16% 331 Search PROJECT+SCHEDULING Search PROJECT+SCHEDULING
2 RESOURCE CONSTRAINED PROJECT SCHEDULING 85 67% 4% 76 Search RESOURCE+CONSTRAINED+PROJECT+SCHEDULING Search RESOURCE+CONSTRAINED+PROJECT+SCHEDULING
3 TIME COST TRADE OFF 50 73% 2% 38 Search TIME+COST+TRADE+OFF Search TIME+COST+TRADE+OFF
4 PROJECT MANAGEMENT AND SCHEDULING 33 72% 1% 26 Search PROJECT+MANAGEMENT+AND+SCHEDULING Search PROJECT+MANAGEMENT+AND+SCHEDULING
5 MULTI PROJECT SCHEDULING 21 78% 1% 14 Search MULTI+PROJECT+SCHEDULING Search MULTI+PROJECT+SCHEDULING
6 ACTIVITY NETWORKS 17 72% 1% 13 Search ACTIVITY+NETWORKS Search ACTIVITY+NETWORKS
7 RESOURCE LEVELING 16 52% 1% 22 Search RESOURCE+LEVELING Search RESOURCE+LEVELING
8 PERT 16 33% 2% 40 Search PERT Search PERT
9 EARNED VALUE MANAGEMENT 16 54% 1% 20 Search EARNED+VALUE+MANAGEMENT Search EARNED+VALUE+MANAGEMENT
10 RESOURCE LEVELLING 15 88% 0% 7 Search RESOURCE+LEVELLING Search RESOURCE+LEVELLING

Key Words Plus



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 MULTIPLE RESOURCE 134 93% 2% 51
2 DISCOUNTED CASH FLOWS 68 84% 2% 37
3 PERT NETWORKS 53 57% 3% 64
4 BOUND PROCEDURE 50 88% 1% 23
5 PERT 50 62% 2% 51
6 NET PRESENT VALUE 36 50% 2% 51
7 PROJECT SCHEDULING PROBLEM 30 47% 2% 47
8 HEURISTIC RULES PERFORMANCE 29 88% 1% 14
9 PRESELECTIVE STRATEGIES 29 88% 1% 14
10 COST TRADE OFF 27 92% 1% 11

Journals



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE 19 10% 8% 173
2 JOURNAL OF THE CONSTRUCTION DIVISION-ASCE 2 16% 1% 14

Reviews



Title Publ. year Cit. Active references % act. ref.
to same field
A review of analytical models, approaches and decision support tools in project monitoring and control 2015 2 57 68%
A survey of variants and extensions of the resource-constrained project scheduling problem 2010 121 142 94%
Resource-constrained project scheduling: Notation, classification, models, and methods 1999 490 69 83%
Project scheduling with finite or infinite number of activity processing modes - A survey 2011 40 133 91%
An integrated survey of deterministic project scheduling 2001 137 104 92%
Resource-constrained project scheduling: A survey of recent developments 1998 201 37 92%
A review of methods and algorithms for optimizing construction scheduling 2013 3 43 93%
A review of the contribution of Operational Research to Project Management 2002 42 23 96%
Robust and reactive project scheduling: a review and classification of procedures 2004 62 21 52%
Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio 2011 5 16 88%

Address terms



Rank Address term Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 BETRIEBSWIRT AFTSLEHRE 9 26% 1.4% 28
2 DPTO ECON FINANCIERA MATEMAT 6 100% 0.2% 4
3 LEHRSTUHL PROD LOGISTIK 6 100% 0.2% 4
4 MFG PROD SYST 5 55% 0.3% 6
5 LAMONT 4 75% 0.1% 3
6 WIRT AFTSTHEORIE OPERAT 4 27% 0.6% 13
7 MANAGEMENT INFORMAT OPERAT MANAGEMENT TECH 4 46% 0.3% 6
8 CONSTRUCT ENGN MANAGEMENT 4 11% 1.5% 30
9 MANAGEMENT SCI INNOVAT 3 21% 0.7% 14
10 HAM PI 3 100% 0.1% 3

Related classes at same level (level 1)



Rank Relatedness score Related classes
1 0.0000097480 JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE//CONSTRUCTION PRODUCTIVITY//JOURNAL OF THE CONSTRUCTION DIVISION-ASCE
2 0.0000081409 JOB SHOP SCHEDULING//JOB SHOP//FLEXIBLE JOB SHOP SCHEDULING
3 0.0000080571 HIGHWAY ALIGNMENT OPTIMIZATION//EARTHWORK OPTIMIZATION//EARTHMOVING
4 0.0000077316 COST OVERRUNS//COST OVERRUN//REFERENCE CLASS FORECASTING
5 0.0000072178 DESIGN STRUCTURE MATRIX//ENGINEERING CHANGE MANAGEMENT//DESIGN STRUCTURE MATRIX DSM
6 0.0000064094 ROLE TRANSFER//KNOWLEDGE INTENSIVE SERVICE//PRODUCT NAMED ENTITY RECOGNITION
7 0.0000060817 AUTOMATION IN CONSTRUCTION//JOURNAL OF COMPUTING IN CIVIL ENGINEERING//JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
8 0.0000053355 JUMP NUMBER//LATTICE OF MAXIMAL ANTICHAINS//SETUP PROBLEM
9 0.0000050530 JOURNAL OF MANAGEMENT IN ENGINEERING//CONTRACTOR SELECTION//JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
10 0.0000048630 CHROMATIC SUM//MALLEABLE TASKS//UNIT EXECUTION TIMES