Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
25896 | 222 | 19.6 | 26% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
2365 | 3870 | PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT//VEHICLE SYSTEM DYNAMICS//WHEEL RAIL CONTACT |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | TRACK MONITORING | Author keyword | 3 | 57% | 2% | 4 |
2 | AXLE BOX | Author keyword | 3 | 100% | 1% | 3 |
3 | TRACK GEOMETRY DEGRADATION | Author keyword | 3 | 100% | 1% | 3 |
4 | TRACK GEOMETRY QUALITY | Author keyword | 3 | 100% | 1% | 3 |
5 | GEOMETRY INDEX | Author keyword | 2 | 67% | 1% | 2 |
6 | RAILROAD TRACK INSPECTION | Author keyword | 2 | 67% | 1% | 2 |
7 | TRACK VEHICLE INTERACTION | Author keyword | 2 | 67% | 1% | 2 |
8 | RAILWAY TRACK GEOMETRY | Author keyword | 2 | 50% | 1% | 3 |
9 | RAILWAY MAINTENANCE | Author keyword | 2 | 40% | 2% | 4 |
10 | TAMPING | Author keyword | 2 | 27% | 3% | 6 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | TRACK MONITORING | 3 | 57% | 2% | 4 | Search TRACK+MONITORING | Search TRACK+MONITORING |
2 | AXLE BOX | 3 | 100% | 1% | 3 | Search AXLE+BOX | Search AXLE+BOX |
3 | TRACK GEOMETRY DEGRADATION | 3 | 100% | 1% | 3 | Search TRACK+GEOMETRY+DEGRADATION | Search TRACK+GEOMETRY+DEGRADATION |
4 | TRACK GEOMETRY QUALITY | 3 | 100% | 1% | 3 | Search TRACK+GEOMETRY+QUALITY | Search TRACK+GEOMETRY+QUALITY |
5 | GEOMETRY INDEX | 2 | 67% | 1% | 2 | Search GEOMETRY+INDEX | Search GEOMETRY+INDEX |
6 | RAILROAD TRACK INSPECTION | 2 | 67% | 1% | 2 | Search RAILROAD+TRACK+INSPECTION | Search RAILROAD+TRACK+INSPECTION |
7 | TRACK VEHICLE INTERACTION | 2 | 67% | 1% | 2 | Search TRACK+VEHICLE+INTERACTION | Search TRACK+VEHICLE+INTERACTION |
8 | RAILWAY TRACK GEOMETRY | 2 | 50% | 1% | 3 | Search RAILWAY+TRACK+GEOMETRY | Search RAILWAY+TRACK+GEOMETRY |
9 | RAILWAY MAINTENANCE | 2 | 40% | 2% | 4 | Search RAILWAY+MAINTENANCE | Search RAILWAY+MAINTENANCE |
10 | TAMPING | 2 | 27% | 3% | 6 | Search TAMPING | Search TAMPING |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | MAP MATCHING APPROACH | 9 | 83% | 2% | 5 |
2 | SERVICE RAILWAY VEHICLES | 6 | 100% | 2% | 4 |
3 | AXLE BOX | 1 | 50% | 1% | 2 |
4 | GEOMETRY QUALITY | 1 | 100% | 1% | 2 |
5 | BLOCK DIAGRAM METHOD | 1 | 50% | 0% | 1 |
6 | TRACK MAINTENANCE | 1 | 29% | 1% | 2 |
7 | MAINTENANCE ACTIVITIES | 1 | 20% | 1% | 3 |
8 | ASPHALT MIXING PLANT | 0 | 33% | 0% | 1 |
9 | TRACK IRREGULARITY | 0 | 33% | 0% | 1 |
10 | SLEEPERS | 0 | 12% | 1% | 2 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
---|---|---|---|---|
The influence of track irregularities on the running behavior of high-speed trains | 2013 | 0 | 1 | 100% |
A REVIEW OF WOOD CROSSTIE PERFORMANCE | 1995 | 5 | 5 | 20% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | LULEA RAILWAY | 1 | 50% | 0.9% | 2 |
2 | OPERAT MAINTENANCE ACOUST ENGN | 1 | 100% | 0.9% | 2 |
3 | TRANSPORTAT INFORMAT MANAGEMENT | 1 | 100% | 0.9% | 2 |
4 | FED RAILRD ADM | 1 | 40% | 0.9% | 2 |
5 | RAILWAY EDUC | 1 | 23% | 1.4% | 3 |
6 | EXCELLENCE RAILWAY TRANSPORT | 1 | 50% | 0.5% | 1 |
7 | KTH RAIL VEHICLES | 1 | 50% | 0.5% | 1 |
8 | OFF ASSET MANAGEMENT | 1 | 50% | 0.5% | 1 |
9 | OPTOELECT MEASUREMENT CONTROL TECHNOL | 1 | 50% | 0.5% | 1 |
10 | TRANSPORTAT TECHNOL INC | 1 | 50% | 0.5% | 1 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000227786 | POINT MECHANISMS//REMOTE CONDITION MONITORING//ETSII CIUDAD REAL |
2 | 0.0000199763 | VEHICLE SYSTEM DYNAMICS//WHEEL RAIL CONTACT//PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT |
3 | 0.0000126552 | TRAIN TIMETABLING//TRAIN SCHEDULING//TRAIN ROUTING |
4 | 0.0000113146 | HAZARDOUS MATERIALS//DANGEROUS GOODS//HAZARDOUS MATERIAL TRANSPORTATION |
5 | 0.0000100693 | PAVEMENT MANAGEMENT//JOURNAL OF INFRASTRUCTURE SYSTEMS//PAVEMENT MAINTENANCE AND REHABILITATION |
6 | 0.0000076204 | NONINDEPENDENCE//HEARING COMFORT LEVEL//QUESTIONNAIRES SURVEYS |
7 | 0.0000069447 | KNOWLEDGE BASED COMPUTER MODELS//SUSTAINABLE INFRASTRUCTURE DEVELOPMENT//ASIA PACIFIC MANAGEMENT |
8 | 0.0000066487 | RAILWAY AXLES//A1N STEEL//INSPECTION INTERVALS |
9 | 0.0000060576 | MARKOV RELIABILITY MODELS//DRIVER ERRORS//DRIVER RELIABILITY |
10 | 0.0000058607 | GENERATOR MAINTENANCE SCHEDULING//MAINTENANCE SCHEDULING//GENERATION MAINTENANCE SCHEDULING |