Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
25856 | 223 | 19.5 | 37% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
365 | 16667 | IEEE TRANSACTIONS ON POWER SYSTEMS//INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS//IEEE TRANSACTIONS ON SMART GRID |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | GENERATOR MAINTENANCE SCHEDULING | Author keyword | 15 | 68% | 6% | 13 |
2 | MAINTENANCE SCHEDULING | Author keyword | 8 | 21% | 16% | 36 |
3 | GENERATION MAINTENANCE SCHEDULING | Author keyword | 7 | 57% | 4% | 8 |
4 | TRANSMISSION MAINTENANCE SCHEDULING | Author keyword | 4 | 67% | 2% | 4 |
5 | UNIT MAINTENANCE SCHEDULING | Author keyword | 3 | 50% | 2% | 5 |
6 | INNOVAT INTELLECTUAL PROPERTY | Address | 3 | 100% | 1% | 3 |
7 | MAINTENANCE SCHEDULING OF GENERATING UNIT | Author keyword | 2 | 67% | 1% | 2 |
8 | UNEXPECTED UNIT FAILURE | Author keyword | 2 | 67% | 1% | 2 |
9 | INDIAN MINES | Address | 2 | 50% | 1% | 3 |
10 | FUZZY LOSS OF LOAD PROBABILITY FLOLP | Author keyword | 1 | 100% | 1% | 2 |
Web of Science journal categories |
Author Key Words |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | NETWORK CONSTRAINTS | 12 | 52% | 8% | 17 |
2 | GENERATING UNITS | 1 | 16% | 3% | 7 |
3 | TERM TRANSMISSION | 1 | 40% | 1% | 2 |
4 | EMISSION CONSTRAINTS | 1 | 50% | 0% | 1 |
5 | THERMAL GENERATING UNITS | 1 | 50% | 0% | 1 |
6 | MECHANICAL COMPONENTS | 0 | 13% | 1% | 2 |
7 | GENERATING UNIT | 0 | 20% | 0% | 1 |
8 | SOLUTION METHODOLOGY | 0 | 20% | 0% | 1 |
9 | RESTRUCTURED POWER SYSTEMS | 0 | 17% | 0% | 1 |
10 | THERMAL POWER SYSTEMS | 0 | 17% | 0% | 1 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
---|---|---|---|---|
OPTIMAL PREVENTIVE MAINTENANCE SCHEDULING OF THERMAL GENERATING-UNITS IN POWER-SYSTEMS - A SURVEY OF PROBLEM FORMULATIONS AND SOLUTION METHODS | 1988 | 16 | 8 | 88% |
A review of recent advances in generator maintenance scheduling | 1998 | 4 | 24 | 88% |
APPROACHES TO LIFE-CYCLE COST-ANALYSIS WITH SYSTEM AVAILABILITY CONSTRAINTS - A REVIEW | 1986 | 1 | 11 | 55% |
Plant bioinformatics: from genome to phenome | 2004 | 38 | 56 | 2% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | INNOVAT INTELLECTUAL PROPERTY | 3 | 100% | 1.3% | 3 |
2 | INDIAN MINES | 2 | 50% | 1.3% | 3 |
3 | REAL TIME INTELLIGENT SYST | 1 | 100% | 0.9% | 2 |
4 | WYDZIAL SAMOCHODOW MASZYN ROBOCZYCH | 1 | 40% | 0.9% | 2 |
5 | ELECT ENGN PROGRAMME | 1 | 50% | 0.4% | 1 |
6 | HYDROPOWER DIGITAL ENGN | 1 | 50% | 0.4% | 1 |
7 | POWER DISPATCH CONTROL | 1 | 50% | 0.4% | 1 |
8 | LIX CNRS | 0 | 33% | 0.4% | 1 |
9 | POJAZDOW | 0 | 33% | 0.4% | 1 |
10 | AUTOMATED EDULING PLANNING GRP | 0 | 25% | 0.4% | 1 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000204553 | POWER SYST GRP//RELIABILITY WORTH//GENERATION SYSTEM RELIABILITY |
2 | 0.0000182512 | UNIT COMMITMENT//HYDROTHERMAL SCHEDULING//CASCADED RESERVOIRS |
3 | 0.0000117562 | MINIMAL REPAIR//GEOMETRIC PROCESS//PREVENTIVE MAINTENANCE |
4 | 0.0000109056 | TRANSMISSION EXPANSION PLANNING//GENERATION EXPANSION PLANNING//TRANSMISSION NETWORK EXPANSION PLANNING |
5 | 0.0000065041 | INFORMATION TECHNOLOGY IT IMPLEMENTATION//RD MANPOWER//TOPIC AREAS |
6 | 0.0000062745 | PROBABILITY OF FAILURE ON DEMAND//COMMON CAUSE FAILURE//PREMIER CONSULTING ENGN |
7 | 0.0000058607 | TRACK MONITORING//AXLE BOX//TRACK GEOMETRY DEGRADATION |
8 | 0.0000055458 | ELECTRICITY MARKETS//MARKET POWER//ELECTRICITY MARKET |
9 | 0.0000053385 | FLEET AVAILABILITY//FLIGHT AND MAINTENANCE PLANNING//COMBAT WING 111 |
10 | 0.0000052925 | DISCRETE DECISION PROCESS//ECON ENGN//MULTIOBJECTIVE DYNAMIC PROGRAMMING |