Class information for:
Level 1: HIGHWAY ALIGNMENT OPTIMIZATION//EARTHWORK OPTIMIZATION//EARTHMOVING

Basic class information

ID Publications Average number
of references
Avg. shr. active
ref. in WoS
25099 243 20.8 29%



Bar chart of Publication_year

Last years might be incomplete

Classes in level above (level 2)



ID, lev.
above
Publications Label for level above
891 10723 JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE//JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT//AUTOMATION IN CONSTRUCTION

Terms with highest relevance score



Rank Term Type of term Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 HIGHWAY ALIGNMENT OPTIMIZATION Author keyword 11 69% 4% 9
2 EARTHWORK OPTIMIZATION Author keyword 6 100% 2% 4
3 EARTHMOVING Author keyword 5 39% 5% 11
4 EARTHWORK ALLOCATION Author keyword 5 63% 2% 5
5 ROADWAY GRADES Author keyword 3 100% 1% 3
6 AGGREGATE BLENDING Author keyword 2 67% 1% 2
7 HIGHWAY COSTS Author keyword 2 67% 1% 2
8 CUT AND FILL Author keyword 2 43% 1% 3
9 EARTH MOVING Author keyword 2 43% 1% 3
10 DEMAND COVERING Author keyword 1 50% 1% 2

Web of Science journal categories

Author Key Words



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
LCSH search Wikipedia search
1 HIGHWAY ALIGNMENT OPTIMIZATION 11 69% 4% 9 Search HIGHWAY+ALIGNMENT+OPTIMIZATION Search HIGHWAY+ALIGNMENT+OPTIMIZATION
2 EARTHWORK OPTIMIZATION 6 100% 2% 4 Search EARTHWORK+OPTIMIZATION Search EARTHWORK+OPTIMIZATION
3 EARTHMOVING 5 39% 5% 11 Search EARTHMOVING Search EARTHMOVING
4 EARTHWORK ALLOCATION 5 63% 2% 5 Search EARTHWORK+ALLOCATION Search EARTHWORK+ALLOCATION
5 ROADWAY GRADES 3 100% 1% 3 Search ROADWAY+GRADES Search ROADWAY+GRADES
6 AGGREGATE BLENDING 2 67% 1% 2 Search AGGREGATE+BLENDING Search AGGREGATE+BLENDING
7 HIGHWAY COSTS 2 67% 1% 2 Search HIGHWAY+COSTS Search HIGHWAY+COSTS
8 CUT AND FILL 2 43% 1% 3 Search CUT+AND+FILL Search CUT+AND+FILL
9 EARTH MOVING 2 43% 1% 3 Search EARTH+MOVING Search EARTH+MOVING
10 DEMAND COVERING 1 50% 1% 2 Search DEMAND+COVERING Search DEMAND+COVERING

Key Words Plus



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ.
in class
1 MINIMIZE EARTHWORK COST 12 86% 2% 6
2 ROADWAY GRADES 9 83% 2% 5
3 HIGHWAY ALIGNMENT 6 100% 2% 4
4 SPLINE TECHNIQUE 6 100% 2% 4
5 EARTHMOVING OPERATIONS 4 50% 2% 6
6 UNIT COSTS 4 56% 2% 5
7 EARTH MOVING OPERATIONS 3 100% 1% 3
8 ALIGNMENT OPTIMIZATION 3 60% 1% 3
9 FEEDER BUS SYSTEM 1 50% 1% 2
10 FILL PROBLEM 1 100% 1% 2

Journals

Reviews



Title Publ. year Cit. Active
references
% act. ref.
to same field
Estimation of earthworks execution time cost by means of artificial neural networks 2010 15 15 33%

Address terms



Rank Address term Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ.
in class
1 CM GRP 1 50% 0.4% 1
2 DIPARTIMENTO INGN RURAL 1 50% 0.4% 1
3 MARKIN CNRL NAT OURCES ENGN IL 3 044 1 50% 0.4% 1
4 OFF MAINTENANCE 1 50% 0.4% 1
5 DECIS SCI DISCIPLINE 0 33% 0.4% 1
6 GRP DECIS ANAL GERAD 0 33% 0.4% 1
7 ORTACA POLYTECH 0 33% 0.4% 1
8 UUC 0 25% 0.4% 1
9 ADV TRANSPORTAT INFRASTRUCT ENGN 0 20% 0.4% 1
10 CEIE 0 20% 0.4% 1

Related classes at same level (level 1)



Rank Relatedness score Related classes
1 0.0000152464 FOREST ROADS//FOREST ROAD//ROAD EROSION
2 0.0000149873 SIGHT DISTANCE//HORIZONTAL CURVES//HIGHWAY GEOMETRIC DESIGN
3 0.0000139371 PERSONAL RAPID TRANSIT//TRANSPORTATION ENGINEERING JOURNAL OF ASCE//ADV TRANSPORT GRP
4 0.0000127689 INCO LIMITED//REMOTE MINING TECHNOLOGY//SOLUTIONS OF ACRYLIC ACID
5 0.0000122044 AUTOMATION IN CONSTRUCTION//JOURNAL OF COMPUTING IN CIVIL ENGINEERING//JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
6 0.0000087493 JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE//CONSTRUCTION PRODUCTIVITY//JOURNAL OF THE CONSTRUCTION DIVISION-ASCE
7 0.0000080571 PROJECT SCHEDULING//RESOURCE CONSTRAINED PROJECT SCHEDULING//TIME COST TRADE OFF
8 0.0000079643 ASSET MANAGEMENT PLAN//BUDGET UNCERTAINTY//COMPUTER ASSISTED OPERATION
9 0.0000079203 TRANSIT NETWORK DESIGN//TRANSIT ASSIGNMENT//TRANSIT OPERATIONS
10 0.0000068640 INTEGRATED COMPUTER-AIDED ENGINEERING//COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING//INTERNATIONAL JOURNAL OF NEURAL SYSTEMS