Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
19529 | 437 | 23.6 | 37% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
221 | 19942 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | AGGREGATE PRODUCTION PLANNING | Author keyword | 29 | 54% | 9% | 38 |
2 | HIERARCHICAL PRODUCTION PLANNING | Author keyword | 14 | 53% | 4% | 19 |
3 | FLEXIBLE AUTOMATED WORKSHOPS | Author keyword | 11 | 100% | 1% | 6 |
4 | HIERARCHICAL STOCHASTIC PRODUCTION PLANNING | Author keyword | 6 | 100% | 1% | 4 |
5 | AGGREGATE PLANNING | Author keyword | 5 | 31% | 3% | 14 |
6 | INTERACTION PREDICTION APPROACH | Author keyword | 4 | 67% | 1% | 4 |
7 | APPROVED VENDOR MATRIX | Author keyword | 3 | 100% | 1% | 3 |
8 | TEMPORAL AND SPATIAL INTEGRATION | Author keyword | 3 | 100% | 1% | 3 |
9 | AGGREGATE PRODUCTION PLANNING APP | Author keyword | 3 | 60% | 1% | 3 |
10 | FUZZY DEMANDS | Author keyword | 3 | 60% | 1% | 3 |
Web of Science journal categories |
Author Key Words |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | EVALUATION PETRI NETS | 21 | 90% | 2% | 9 |
2 | INTERACTION PREDICTION APPROACH | 8 | 100% | 1% | 5 |
3 | PRODUCTION SWITCHING HEURISTICS | 8 | 100% | 1% | 5 |
4 | PRODUCTION PLANNING SYSTEM | 6 | 80% | 1% | 4 |
5 | DELAY INTERACTION | 3 | 60% | 1% | 3 |
6 | MULTIMACHINE ENVIRONMENT | 1 | 100% | 0% | 2 |
7 | MACHINE REQUIREMENTS | 1 | 50% | 0% | 1 |
8 | PRODUCTION PLANS | 1 | 50% | 0% | 1 |
9 | SUPPLY CHAIN SIMULATION | 1 | 29% | 0% | 2 |
10 | DISTRIBUTED DECISION MAKING | 0 | 17% | 0% | 2 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
---|---|---|---|---|
AGGREGATE PRODUCTION PLANNING - A SURVEY OF MODELS AND METHODOLOGIES | 1992 | 85 | 24 | 92% |
Distributed decision making - a unified approach | 2003 | 42 | 10 | 30% |
Genetic algorithms: Concepts and applications | 1996 | 324 | 16 | 6% |
MANAGEMENT ACCOUNTING AND OPERATIONAL-RESEARCH | 1983 | 5 | 6 | 50% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | ALBERTA CONSTRUCT IND CHAIR CONSTRUCT ENGN | 1 | 50% | 0.2% | 1 |
2 | DEP GMP | 1 | 50% | 0.2% | 1 |
3 | IND STAT OPERAT UNIT ISO RU | 1 | 50% | 0.2% | 1 |
4 | MFG INTELLIGENCE | 1 | 50% | 0.2% | 1 |
5 | PROD SYSTEMAT STUDIES GRP | 1 | 50% | 0.2% | 1 |
6 | ESCUELA INGN IND ESTADIST | 1 | 22% | 0.5% | 2 |
7 | IND MANAGEMENT GRP | 0 | 33% | 0.2% | 1 |
8 | INVEST GESTIO ENGN PROD CIGIP | 0 | 33% | 0.2% | 1 |
9 | CIGIP PROD MANAGEMENT ENGN | 0 | 18% | 0.5% | 2 |
10 | BOWATER MANAGEMENT MARKETING | 0 | 25% | 0.2% | 1 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000223306 | LOT SIZING//CAPACITATED LOT SIZING//ELSP |
2 | 0.0000187410 | WORKLOAD CONTROL//ORDER RELEASE//WORKLOAD CONTROL WLC |
3 | 0.0000161348 | GOAL PROGRAMMING//MULTI SEGMENT GOAL PROGRAMMING//FUZZY GOAL PROGRAMMING |
4 | 0.0000136931 | SUPPLY CHAIN NETWORK DESIGN//SUPPLY CHAIN DESIGN//FACILITY LOCATION |
5 | 0.0000083934 | WAFER FABRICATION//IND ENGN SYST MANAGEMENT//FUZZY BACK PROPAGATION NETWORK |
6 | 0.0000081066 | PROD SYST DESIGN CONTROL//HEDGING POINT POLICY//AUTOMATED PROD ENGN |
7 | 0.0000078366 | INTERMITTENT PRODUCTION//LEARNING CURVES//LEARNING AND FORGETTING |
8 | 0.0000076976 | FUZZY LINEAR PROGRAMMING//FUZZY NUMBERS//SOLID TRANSPORTATION PROBLEM |
9 | 0.0000076014 | STOCHASTIC PROGRAMMING//BRANCH AND FIX COORDINATION//DPTO ECON LICADA 3 |
10 | 0.0000075406 | JOB SHOP SCHEDULING//JOB SHOP//FLEXIBLE JOB SHOP SCHEDULING |