Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
18935 | 463 | 25.0 | 52% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
221 | 19942 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | HOIST SCHEDULING | Author keyword | 44 | 85% | 5% | 23 |
2 | ROBOTIC CELL | Author keyword | 41 | 69% | 8% | 35 |
3 | CYCLIC SCHEDULING | Author keyword | 30 | 41% | 12% | 57 |
4 | ROBOTIC CELLS | Author keyword | 29 | 77% | 4% | 20 |
5 | CLUSTER TOOLS | Author keyword | 22 | 58% | 6% | 26 |
6 | CLUSTER TOOL | Author keyword | 19 | 53% | 5% | 25 |
7 | ROBOTIC SCHEDULING | Author keyword | 17 | 79% | 2% | 11 |
8 | CYCLIC HOIST SCHEDULING | Author keyword | 17 | 100% | 2% | 8 |
9 | CYCLIC SOLUTIONS | Author keyword | 12 | 86% | 1% | 6 |
10 | HOIST SCHEDULING PROBLEM | Author keyword | 11 | 78% | 2% | 7 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | HOIST SCHEDULING | 44 | 85% | 5% | 23 | Search HOIST+SCHEDULING | Search HOIST+SCHEDULING |
2 | ROBOTIC CELL | 41 | 69% | 8% | 35 | Search ROBOTIC+CELL | Search ROBOTIC+CELL |
3 | CYCLIC SCHEDULING | 30 | 41% | 12% | 57 | Search CYCLIC+SCHEDULING | Search CYCLIC+SCHEDULING |
4 | ROBOTIC CELLS | 29 | 77% | 4% | 20 | Search ROBOTIC+CELLS | Search ROBOTIC+CELLS |
5 | CLUSTER TOOLS | 22 | 58% | 6% | 26 | Search CLUSTER+TOOLS | Search CLUSTER+TOOLS |
6 | CLUSTER TOOL | 19 | 53% | 5% | 25 | Search CLUSTER+TOOL | Search CLUSTER+TOOL |
7 | ROBOTIC SCHEDULING | 17 | 79% | 2% | 11 | Search ROBOTIC+SCHEDULING | Search ROBOTIC+SCHEDULING |
8 | CYCLIC HOIST SCHEDULING | 17 | 100% | 2% | 8 | Search CYCLIC+HOIST+SCHEDULING | Search CYCLIC+HOIST+SCHEDULING |
9 | CYCLIC SOLUTIONS | 12 | 86% | 1% | 6 | Search CYCLIC+SOLUTIONS | Search CYCLIC+SOLUTIONS |
10 | HOIST SCHEDULING PROBLEM | 11 | 78% | 2% | 7 | Search HOIST+SCHEDULING+PROBLEM | Search HOIST+SCHEDULING+PROBLEM |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | HOIST | 52 | 77% | 8% | 36 |
2 | MULTICLUSTER TOOLS | 45 | 83% | 5% | 25 |
3 | EVENT GRAPH | 38 | 86% | 4% | 19 |
4 | STEADY STATE THROUGHPUT | 35 | 74% | 6% | 26 |
5 | ROBOTIC CELLS | 33 | 67% | 6% | 29 |
6 | SINGLE HOIST | 31 | 76% | 5% | 22 |
7 | CLUSTER TOOL PERFORMANCE | 27 | 92% | 2% | 11 |
8 | TIME WINDOW CONSTRAINTS | 18 | 38% | 8% | 38 |
9 | COMMON SERVER | 18 | 89% | 2% | 8 |
10 | ELECTROPLATING LINE | 17 | 75% | 3% | 12 |
Journals |
Reviews |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | HGRP SYST REGELUNGSTHEORIE | 4 | 75% | 0.6% | 3 |
2 | MEDIATED MATTER GRP | 2 | 67% | 0.4% | 2 |
3 | LOSI | 1 | 17% | 1.7% | 8 |
4 | ENGN MANAGEMENT PROC | 1 | 100% | 0.4% | 2 |
5 | DIPARTIMENTO INFORAMAT AUTOMAZ | 1 | 50% | 0.2% | 1 |
6 | IBISC FRE CNRS 3190 | 1 | 50% | 0.2% | 1 |
7 | LIMOS INFORMAT | 1 | 50% | 0.2% | 1 |
8 | ORGANITZACIO CONTROL SISTEMES IND | 1 | 50% | 0.2% | 1 |
9 | PLANNING ENGN | 1 | 50% | 0.2% | 1 |
10 | UNEXT | 1 | 50% | 0.2% | 1 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000148712 | FLOWSHOP//LOT STREAMING//MAKESPAN |
2 | 0.0000144414 | PETRI NETS//DEADLOCK PREVENTION//DEADLOCK AVOIDANCE |
3 | 0.0000113973 | BATCH PROCESSING MACHINE//BATCH PROCESSING MACHINES//BATCHING |
4 | 0.0000102778 | AUTOMATED GUIDED VEHICLE SYSTEMS//AUTOMATED GUIDED VEHICLES//AUTOMATED MATERIAL HANDLING SYSTEM |
5 | 0.0000090246 | PULSE INTERLEAVING//COUPLED TASKS//DWELL SCHEDULING |
6 | 0.0000082689 | WAFER FABRICATION//IND ENGN SYST MANAGEMENT//FUZZY BACK PROPAGATION NETWORK |
7 | 0.0000081981 | MAX ALGEBRA//MATEMAT BEPPO LEVI//MAX PLUS ALGEBRA |
8 | 0.0000078024 | JOB SHOP SCHEDULING//JOB SHOP//FLEXIBLE JOB SHOP SCHEDULING |
9 | 0.0000073274 | CODE TRANSFORMATIONS//DUAL RING USAGE//SIMPLIFIED PROTOCOL |
10 | 0.0000072167 | FLEXIBLE MANUFACTURING SYSTEMS//TOOL SWITCHING//FLEXIBLE MANUFACTURING SYSTEM |