Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
16176 | 602 | 19.3 | 47% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
857 | 10958 | INVENTORY//INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS//INVENTORY CONTROL |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | PROD SYST DESIGN CONTROL | Address | 20 | 59% | 4% | 22 |
2 | HEDGING POINT POLICY | Author keyword | 17 | 72% | 2% | 13 |
3 | AUTOMATED PROD ENGN | Address | 13 | 34% | 5% | 31 |
4 | HEDGING POINT | Author keyword | 12 | 86% | 1% | 6 |
5 | LCCSP | Address | 11 | 100% | 1% | 6 |
6 | INTEGRATED PROD TECHNOL | Address | 8 | 75% | 1% | 6 |
7 | STOCHASTIC MANUFACTURING SYSTEMS | Author keyword | 8 | 75% | 1% | 6 |
8 | INTERDISCIPLINARY STUDIES LOGIST | Address | 7 | 53% | 1% | 9 |
9 | SWITCHED ARRIVAL SYSTEM | Author keyword | 6 | 80% | 1% | 4 |
10 | MANUFACTURING FLOW CONTROL | Author keyword | 6 | 71% | 1% | 5 |
Web of Science journal categories |
Author Key Words |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | UNRELIABLE MANUFACTURING SYSTEMS | 15 | 88% | 1% | 7 |
2 | FLOW CONTROLLERS | 12 | 75% | 1% | 9 |
3 | MULTIPLE MACHINE | 9 | 64% | 1% | 9 |
4 | PRONE MANUFACTURING SYSTEM | 9 | 83% | 1% | 5 |
5 | PRONE PRODUCTION SYSTEMS | 6 | 71% | 1% | 5 |
6 | MANUFACTURING SYSTEM | 6 | 16% | 5% | 32 |
7 | STOCHASTIC FLUID MODELS | 5 | 44% | 1% | 8 |
8 | MULTI INVENTORY SYSTEMS | 4 | 67% | 1% | 4 |
9 | PRONE MANUFACTURING SYSTEMS | 4 | 67% | 1% | 4 |
10 | BACKLOG | 4 | 75% | 0% | 3 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references | % act. ref. to same field |
---|---|---|---|---|
Lockout/tagout and operational risks in the production control of manufacturing systems with passive redundancy | 2011 | 1 | 11 | 45% |
Fuzzy logic in manufacturing: A review of literature and a specialized application | 2011 | 22 | 108 | 7% |
A SUBOPTIMAL POLICY FOR STOCHASTIC PRODUCTION PLANNING PROBLEM | 1994 | 0 | 2 | 100% |
STOCHASTIC-CONTROL THEORY AND OPERATIONAL-RESEARCH | 1984 | 20 | 9 | 11% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | PROD SYST DESIGN CONTROL | 20 | 59% | 3.7% | 22 |
2 | AUTOMATED PROD ENGN | 13 | 34% | 5.1% | 31 |
3 | LCCSP | 11 | 100% | 1.0% | 6 |
4 | INTEGRATED PROD TECHNOL | 8 | 75% | 1.0% | 6 |
5 | INTERDISCIPLINARY STUDIES LOGIST | 7 | 53% | 1.5% | 9 |
6 | COMPUTERIZED SYST | 2 | 43% | 0.5% | 3 |
7 | LGIPM INRIA | 1 | 100% | 0.3% | 2 |
8 | RELIABIL MAINTENANCE PROJECT TEAM | 1 | 100% | 0.3% | 2 |
9 | OPERAT DECIS SYST | 1 | 18% | 1.2% | 7 |
10 | LGIPM | 1 | 12% | 1.7% | 10 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000094618 | PRODUCTION LINES//BUFFER ALLOCATION//UNRELIABLE MACHINES |
2 | 0.0000092499 | SINGULAR STOCHASTIC CONTROL//OPTIMAL STOPPING//REVERSIBLE INVESTMENT |
3 | 0.0000091773 | DYNAMICS OF THE FIRM//EMISSION POLICY//HISTORY DEPENDENT EQUILIBRIA |
4 | 0.0000089305 | HEAVY TRAFFIC//HALFIN WHITT REGIME//MANY SERVER QUEUES |
5 | 0.0000083285 | KANBAN//CONWIP//JUST IN TIME |
6 | 0.0000082550 | STOCHASTIC APPROXIMATION//GRADIENT ESTIMATION//FREQUENCY DOMAIN METHODOLOGY |
7 | 0.0000081066 | AGGREGATE PRODUCTION PLANNING//HIERARCHICAL PRODUCTION PLANNING//FLEXIBLE AUTOMATED WORKSHOPS |
8 | 0.0000079741 | SINGULARLY PERTURBED MARKOV CHAIN//FIBER DYNAMICS//ANISOTROPIC SINGULAR PERTURBATIONS |
9 | 0.0000079461 | MINIMAL REPAIR//GEOMETRIC PROCESS//PREVENTIVE MAINTENANCE |
10 | 0.0000078290 | BULLWHIP EFFECT//LOGIST SYST DYNAM GRP//BULLWHIP |