Class information for:
Level 1: WAFER FABRICATION//IND ENGN SYST MANAGEMENT//FUZZY BACK PROPAGATION NETWORK

Basic class information

ID Publications Average number
of references
Avg. shr. active
ref. in WoS
12340 849 22.9 50%



Bar chart of Publication_year

Last years might be incomplete

Classes in level above (level 2)



ID, lev.
above
Publications Label for level above
221 19942 INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING

Terms with highest relevance score



Rank Term Type of term Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 WAFER FABRICATION Author keyword 41 52% 7% 56
2 IND ENGN SYST MANAGEMENT Address 33 35% 9% 77
3 FUZZY BACK PROPAGATION NETWORK Author keyword 19 80% 1% 12
4 WAFER FAB Author keyword 19 71% 2% 15
5 SEMICONDUCTOR MANUFACTURING Author keyword 15 16% 10% 88
6 FLUCTUATION SMOOTHING Author keyword 15 82% 1% 9
7 MACHINE DEDICATION Author keyword 15 88% 1% 7
8 OUTPUT TIME PREDICTION Author keyword 11 100% 1% 6
9 REMAINING CYCLE TIME Author keyword 11 100% 1% 6
10 CAPACITY PLANNING Author keyword 6 11% 6% 55

Web of Science journal categories

Author Key Words



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
LCSH search Wikipedia search
1 WAFER FABRICATION 41 52% 7% 56 Search WAFER+FABRICATION Search WAFER+FABRICATION
2 FUZZY BACK PROPAGATION NETWORK 19 80% 1% 12 Search FUZZY+BACK+PROPAGATION+NETWORK Search FUZZY+BACK+PROPAGATION+NETWORK
3 WAFER FAB 19 71% 2% 15 Search WAFER+FAB Search WAFER+FAB
4 SEMICONDUCTOR MANUFACTURING 15 16% 10% 88 Search SEMICONDUCTOR+MANUFACTURING Search SEMICONDUCTOR+MANUFACTURING
5 FLUCTUATION SMOOTHING 15 82% 1% 9 Search FLUCTUATION+SMOOTHING Search FLUCTUATION+SMOOTHING
6 MACHINE DEDICATION 15 88% 1% 7 Search MACHINE+DEDICATION Search MACHINE+DEDICATION
7 OUTPUT TIME PREDICTION 11 100% 1% 6 Search OUTPUT+TIME+PREDICTION Search OUTPUT+TIME+PREDICTION
8 REMAINING CYCLE TIME 11 100% 1% 6 Search REMAINING+CYCLE+TIME Search REMAINING+CYCLE+TIME
9 CAPACITY PLANNING 6 11% 6% 55 Search CAPACITY+PLANNING Search CAPACITY+PLANNING
10 SEMICONDUCTOR ASSEMBLY AND TEST 6 80% 0% 4 Search SEMICONDUCTOR+ASSEMBLY+AND+TEST Search SEMICONDUCTOR+ASSEMBLY+AND+TEST

Key Words Plus



Rank Web of Science journal category Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 FBPN ENSEMBLE APPROACH 44 100% 2% 16
2 WAFER FABRICATION 34 46% 6% 55
3 FABRICATION FACILITIES 25 71% 2% 20
4 SOM FBPN 23 100% 1% 10
5 LOT OUTPUT TIME 19 76% 2% 13
6 SCHEDULING MODELS 18 43% 4% 32
7 FLUCTUATION SMOOTHING RULE 17 100% 1% 8
8 JOB RELEASE 17 75% 1% 12
9 NEURAL APPROACH 15 88% 1% 7
10 DUE DATE ASSIGNMENT 13 26% 5% 43

Journals

Reviews



Title Publ. year Cit. Active
references
% act. ref.
to same field
A review on strategic capacity planning for the semiconductor manufacturing industry 2009 22 30 83%
A review of mathematical programming models for strategic capacity planning in manufacturing 2014 3 69 59%
Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity 2013 3 72 40%
A review of multi-factor capacity expansion models for manufacturing plants: Searching for a holistic decision aid 2007 32 33 27%
DEVELOPMENT AND IMPLEMENTATION OF A SCHEDULING SYSTEM FOR A WAFER FABRICATION FACILITY 1988 13 1 100%
Cluster policies and industry development in the Hsinchu Science Park: A retrospective review after 30 years 2013 0 7 29%
Sustainability decision support system based on collaborative control theory 2012 6 30 7%
FUEL-EFFICIENT AUTOS - PROGRESS AND PROGNOSIS 1984 2 3 100%
OPERATIONS-RESEARCH AND CAPACITY EXPANSION PROBLEMS - A SURVEY 1982 182 11 45%
Update on complement in the pathogenesis of systemic lupus erythematosus 2002 8 39 3%

Address terms



Rank Address term Relevance score
(tfidf)
Class's shr.
of term's tot.
occurrences
Shr. of publ.
in class containing
term
Num. of
publ. in
class
1 IND ENGN SYST MANAGEMENT 33 35% 9.1% 77
2 PLANNING OPERAT MANAGEMENT GRP 4 75% 0.4% 3
3 DMOS6 3 100% 0.4% 3
4 WW TMG IT 3 100% 0.4% 3
5 PROGRAM IND ENGN OPERAT 1 100% 0.2% 2
6 CHAIR ENTERPRISE WIDE SOFTWARE SYST 1 33% 0.2% 2
7 CNRS UMR LIMOS 6158 1 33% 0.2% 2
8 MFG LOGIST 1 33% 0.2% 2
9 CONTROL DECIS 1 50% 0.1% 1
10 DIRECT ETAT ENVIRONM 1 50% 0.1% 1

Related classes at same level (level 1)



Rank Relatedness score Related classes
1 0.0000181138 WORKLOAD CONTROL//ORDER RELEASE//WORKLOAD CONTROL WLC
2 0.0000179055 BATCH PROCESSING MACHINE//BATCH PROCESSING MACHINES//BATCHING
3 0.0000145632 THEORY OF CONSTRAINTS//DRUM BUFFER ROPE//THEORY OF CONSTRAINTS TOC
4 0.0000136782 JOB SHOP SCHEDULING//JOB SHOP//FLEXIBLE JOB SHOP SCHEDULING
5 0.0000127812 AUTOMATED GUIDED VEHICLE SYSTEMS//AUTOMATED GUIDED VEHICLES//AUTOMATED MATERIAL HANDLING SYSTEM
6 0.0000110874 RE ENTRANT FACTOR//RE ENTRANT PRODUCTION//DISCONTINUOUS CONSERVATION LAWS
7 0.0000092758 FLEXIBLE MANUFACTURING SYSTEMS//TOOL SWITCHING//FLEXIBLE MANUFACTURING SYSTEM
8 0.0000083934 AGGREGATE PRODUCTION PLANNING//HIERARCHICAL PRODUCTION PLANNING//FLEXIBLE AUTOMATED WORKSHOPS
9 0.0000082918 KANBAN//CONWIP//JUST IN TIME
10 0.0000082689 HOIST SCHEDULING//ROBOTIC CELL//CYCLIC SCHEDULING