Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
12340 | 849 | 22.9 | 50% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
221 | 19942 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH//SINGLE MACHINE//SCHEDULING |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | WAFER FABRICATION | Author keyword | 41 | 52% | 7% | 56 |
2 | IND ENGN SYST MANAGEMENT | Address | 33 | 35% | 9% | 77 |
3 | FUZZY BACK PROPAGATION NETWORK | Author keyword | 19 | 80% | 1% | 12 |
4 | WAFER FAB | Author keyword | 19 | 71% | 2% | 15 |
5 | SEMICONDUCTOR MANUFACTURING | Author keyword | 15 | 16% | 10% | 88 |
6 | FLUCTUATION SMOOTHING | Author keyword | 15 | 82% | 1% | 9 |
7 | MACHINE DEDICATION | Author keyword | 15 | 88% | 1% | 7 |
8 | OUTPUT TIME PREDICTION | Author keyword | 11 | 100% | 1% | 6 |
9 | REMAINING CYCLE TIME | Author keyword | 11 | 100% | 1% | 6 |
10 | CAPACITY PLANNING | Author keyword | 6 | 11% | 6% | 55 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | WAFER FABRICATION | 41 | 52% | 7% | 56 | Search WAFER+FABRICATION | Search WAFER+FABRICATION |
2 | FUZZY BACK PROPAGATION NETWORK | 19 | 80% | 1% | 12 | Search FUZZY+BACK+PROPAGATION+NETWORK | Search FUZZY+BACK+PROPAGATION+NETWORK |
3 | WAFER FAB | 19 | 71% | 2% | 15 | Search WAFER+FAB | Search WAFER+FAB |
4 | SEMICONDUCTOR MANUFACTURING | 15 | 16% | 10% | 88 | Search SEMICONDUCTOR+MANUFACTURING | Search SEMICONDUCTOR+MANUFACTURING |
5 | FLUCTUATION SMOOTHING | 15 | 82% | 1% | 9 | Search FLUCTUATION+SMOOTHING | Search FLUCTUATION+SMOOTHING |
6 | MACHINE DEDICATION | 15 | 88% | 1% | 7 | Search MACHINE+DEDICATION | Search MACHINE+DEDICATION |
7 | OUTPUT TIME PREDICTION | 11 | 100% | 1% | 6 | Search OUTPUT+TIME+PREDICTION | Search OUTPUT+TIME+PREDICTION |
8 | REMAINING CYCLE TIME | 11 | 100% | 1% | 6 | Search REMAINING+CYCLE+TIME | Search REMAINING+CYCLE+TIME |
9 | CAPACITY PLANNING | 6 | 11% | 6% | 55 | Search CAPACITY+PLANNING | Search CAPACITY+PLANNING |
10 | SEMICONDUCTOR ASSEMBLY AND TEST | 6 | 80% | 0% | 4 | Search SEMICONDUCTOR+ASSEMBLY+AND+TEST | Search SEMICONDUCTOR+ASSEMBLY+AND+TEST |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | FBPN ENSEMBLE APPROACH | 44 | 100% | 2% | 16 |
2 | WAFER FABRICATION | 34 | 46% | 6% | 55 |
3 | FABRICATION FACILITIES | 25 | 71% | 2% | 20 |
4 | SOM FBPN | 23 | 100% | 1% | 10 |
5 | LOT OUTPUT TIME | 19 | 76% | 2% | 13 |
6 | SCHEDULING MODELS | 18 | 43% | 4% | 32 |
7 | FLUCTUATION SMOOTHING RULE | 17 | 100% | 1% | 8 |
8 | JOB RELEASE | 17 | 75% | 1% | 12 |
9 | NEURAL APPROACH | 15 | 88% | 1% | 7 |
10 | DUE DATE ASSIGNMENT | 13 | 26% | 5% | 43 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
---|---|---|---|---|
A review on strategic capacity planning for the semiconductor manufacturing industry | 2009 | 22 | 30 | 83% |
A review of mathematical programming models for strategic capacity planning in manufacturing | 2014 | 3 | 69 | 59% |
Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity | 2013 | 3 | 72 | 40% |
A review of multi-factor capacity expansion models for manufacturing plants: Searching for a holistic decision aid | 2007 | 32 | 33 | 27% |
DEVELOPMENT AND IMPLEMENTATION OF A SCHEDULING SYSTEM FOR A WAFER FABRICATION FACILITY | 1988 | 13 | 1 | 100% |
Cluster policies and industry development in the Hsinchu Science Park: A retrospective review after 30 years | 2013 | 0 | 7 | 29% |
Sustainability decision support system based on collaborative control theory | 2012 | 6 | 30 | 7% |
FUEL-EFFICIENT AUTOS - PROGRESS AND PROGNOSIS | 1984 | 2 | 3 | 100% |
OPERATIONS-RESEARCH AND CAPACITY EXPANSION PROBLEMS - A SURVEY | 1982 | 182 | 11 | 45% |
Update on complement in the pathogenesis of systemic lupus erythematosus | 2002 | 8 | 39 | 3% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | IND ENGN SYST MANAGEMENT | 33 | 35% | 9.1% | 77 |
2 | PLANNING OPERAT MANAGEMENT GRP | 4 | 75% | 0.4% | 3 |
3 | DMOS6 | 3 | 100% | 0.4% | 3 |
4 | WW TMG IT | 3 | 100% | 0.4% | 3 |
5 | PROGRAM IND ENGN OPERAT | 1 | 100% | 0.2% | 2 |
6 | CHAIR ENTERPRISE WIDE SOFTWARE SYST | 1 | 33% | 0.2% | 2 |
7 | CNRS UMR LIMOS 6158 | 1 | 33% | 0.2% | 2 |
8 | MFG LOGIST | 1 | 33% | 0.2% | 2 |
9 | CONTROL DECIS | 1 | 50% | 0.1% | 1 |
10 | DIRECT ETAT ENVIRONM | 1 | 50% | 0.1% | 1 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000181138 | WORKLOAD CONTROL//ORDER RELEASE//WORKLOAD CONTROL WLC |
2 | 0.0000179055 | BATCH PROCESSING MACHINE//BATCH PROCESSING MACHINES//BATCHING |
3 | 0.0000145632 | THEORY OF CONSTRAINTS//DRUM BUFFER ROPE//THEORY OF CONSTRAINTS TOC |
4 | 0.0000136782 | JOB SHOP SCHEDULING//JOB SHOP//FLEXIBLE JOB SHOP SCHEDULING |
5 | 0.0000127812 | AUTOMATED GUIDED VEHICLE SYSTEMS//AUTOMATED GUIDED VEHICLES//AUTOMATED MATERIAL HANDLING SYSTEM |
6 | 0.0000110874 | RE ENTRANT FACTOR//RE ENTRANT PRODUCTION//DISCONTINUOUS CONSERVATION LAWS |
7 | 0.0000092758 | FLEXIBLE MANUFACTURING SYSTEMS//TOOL SWITCHING//FLEXIBLE MANUFACTURING SYSTEM |
8 | 0.0000083934 | AGGREGATE PRODUCTION PLANNING//HIERARCHICAL PRODUCTION PLANNING//FLEXIBLE AUTOMATED WORKSHOPS |
9 | 0.0000082918 | KANBAN//CONWIP//JUST IN TIME |
10 | 0.0000082689 | HOIST SCHEDULING//ROBOTIC CELL//CYCLIC SCHEDULING |